Additional informations

Publication type Session Materials
Reference 32-14_1982
Publication year 1982
Publisher CIGRE
Study committees Power system technical performance (C4)
File size 3 MB
Pages number 8
Price for non member 30 €
Price for member Free

Authors

ZAJC, MARTIN, JACOB, BUCHER

The extended power pool model. Operation planning of a multi-reservoir hydro-dominated power production system. A hierarchical approach
The extended power pool model. Operation planning of a multi-reservoir hydro-dominated power production system. A hierarchical approach