Summary
The development of electric power systems in countries where consumption per head is low gives rise to specific technical and economic problems.
- Which means of generation should be chosen and for which type of consumption ?
- What type of transmission, interconnection and distribution systems ?
- Why rely on any particular security of supply criterion rather than any other, in the planning and operation of these systems ?
- How can major constraints to be observed be identified ?
- What will be the future developments in the techniques used ?
Contact us to select your documents from the list of papers below
1. ELECTRICITY IN THE NATIONAL ENERGY POLICIES OF DEVELOPING COUNTRIES
1.1. ROLE OF ELECTRICITY IN THE NATIONAL ENERGY SYSTEM, STRUCTURE OF THE MEANS OF PRODUCTION, CONSUMPTION STRUCTURE
- 110-01 - Electrlcity planning ln the face of rapid change in developing countries
- 110-02 - Economie evaluation of alternate energy sources - Application in developing countries with reference to new technological developments
- 110-03 - SmalI hydro - An ideal source of energy suppfy to isolated areas
- 110-04 - Role of electricity in energy economy of India
- 110-05 - L'électricité dans la politique énergétique du Rwanda. Moyens de production et de transport. Problèmes rencontrés
- 110-06 - The change to alternative energy sources for power generation ln a developing country
- 110-07 - Planificatlon du développement de l'approvisionnement en énergie électrique du Rwanda
- 110-08 - Electric power requirement in Nigeria and strategy for optimum development of adequate and reliable national power system
- 110-09 - Contribution de l'électricité à la réalisation des objectifs de politique énergétique dans les pays en voie de développement. L'évolution des méthodes de planification des systèmes électriques
- 110-10 - Economie d'énergie électrique dans le domaine de la climatisation de l'habitat en Côte d'Ivoire
- 110-11 - Alimentation en énergie électrique du Sud algérien (Sahara)
- 110-12 - Problems of efectricity demand forecasting in developing countries. A case study
- 110-13 - Power market studies : a special approach for developing countries
1.2. METHODS, MEANS AND RESULTS OF A PLANNING STUDY ON UHV, HV, AND MV SYSTEMS
- 120-01 - Planning of rural electrification schemes : economic lmplications - technical and financial
- 120-02 - The Influence of interconnections on systems development
- 120-03 - Planning of a rehabilitation and reinforcement program for a transmission and distribution network in the example of Khartoum
- 120-04 - Réalisation d'un ensemble de logiciels de simulation de réseaux organisé autour d'une base de données relationnelle
- 120-05 - Transmission planning in developing countries
- 120-06 - Role of reliability in planning electric power systems in developing countries
- 120-07 - System engineering aspects for the expansion of electric power systems in developing countries
- 120-08 - Planning and calculation of electric mains by means of personal computers
1.3. DEVELOPMENT EXPERIENCE ON SYSTEMS AND INTERCONNECTIONS
- 130-01 - Benefit study of interconnection between Northwest and North China
- 130-02 - lnterconnection study in West Africa
- 130-03 - Power cooperation between neighbouring countries
- 130-04 - L'énergie électrique comme fourniture ind ispensable au relèvement économique de la République de Guinée-Bissau
- 130-05 - Generation, transmission and distribution of electrical energy in Somalia : present status and perspectives
- 130-06 - China has set up a policy of promoting interconnections on its electric power development programme
- 130-07 - Development of the electric power systems in Saudi Arabia and related research and development programmes
- 130-08 - Interconnexion des réseaux électriques de la communauté économique des pays de grands lacs
- 130-09 - Réseaux isolés de faible étendue. Leurs contraintes générales et évolution des interconnexions
- 130-10 - Expérience de Sonelgaz dans le domaine de la planification
- 130-11 - The role of an electric utiIity in the development of its area of influence. A model applied in a developing country
- 130-12 - Experience from the development of the electric power system in Greece during the last 30 years
- 130-13 - Analysis of the evolution of interconnections between regions in the U.S.A applicable to developing countries
- 130-14 - Evolution of a regional power system of Argentina from isolated small systems to full interconnected conditions
2. LOW POWER ISOLATED SYSTEMS AND DEVELOPMENT OF INTERCONNECTIONS
2.1. TECHNICAL PROBLEMS SPECIFIC TO LOW POWER SYSTEMS AND LONG LINKS
- 210-01 - Questions of system stabiIity and generation - load balance
- 210-02 - Experiences on overcoming the severe stabiIity problem in a weakly connected power grid
- 210-03 - Special problems in voltage and frequency control on small, isolated power systems
- 210-04 - Role of power system stabiIizers in the operation of interconnected systems
- 210-05 - Influence d'un compensateur d'énergie réactive sur le fonctionnement dynamique des réseaux
- 210-06 - Technical problems in the interconnection of electric power systems in the developing countries of Africa
- 210-07 - Aspects particuliers de l'influence des perturbations de la tension sur la conception et l'exploitation des
réseaux - 210-08 - lmprovement of the performance of electric power systems
- 210-09 - Utilisation du courant continu pour les interconnexions à longue distance
- 210-10 - The necessary power reserve in isolated systems with special regard to new system protection devices
- 210-11 - lnterconnection of power systems - technical possibilities and Iimitations
- 210-12 - Field test of power system stabiIizer
- 210-13 - Le fonctionnement dynamique des réseaux de faible puissance. Problèmes, méthodes et moyens d'étude
2.2. NATIONAL AND REGIONAL INTERCONNECTIONS IN DEVELOPING COUNTRIES
- 220-01 - L'interconnexion des réseaux électriques dans la problématique énergétique en Afrique au Sud du Sahara. Situation actuelle et perspectives
- 220-02 - Aspects économiques et techniques de l'interconnexion
- 220-03 - Expérience de l'exploitation de la Iigne d'interconnexion Côte d'Ivoire - Ghana
- 220-04 - Description de l'interconnexion Tunisie-Algérie. Expérience d'exploitation
- 220-05 - Aspects économiques d'une interconnexion régionale. Gabon : interconnexion Libreville-Port Gentil
- 220-06 - Choix technique concernant les grandes Iiaisons internationales - La Iiaison Manantali - Dakar au
- Sénégal
- 220-07 - Challenges encountered in the early operation of interconnected power system in Central America
3. TECHNOLOGICAL DEVELOPMENTS
3.1. ADAPTING TECHNOLOGIES TO THE REQUIREMENTS OF DEVELOPING COUNTRIES
- 310-01 - Economic voltage and optimal capacity of power transmission line
- 310-02 - Economical transmission and distribution of electric power by means of modern reactive power compensation technology
- 310-03 - Alimentation de petites charges directement des I ignes haute tension par le principe SCC
- 310-04 - Expériences NIGELEC de postes HT/MT simplifiés sur les réseaux de transport d'énergie 132 kV et 66kV
- 310-05 - Some aspects of the energy supply to small loads located near long distance transmission trunks
- 310-06 - Postes HT /MT. Idées simpIificatrices tirées de l'expérience de l'énergie électrique de la Côte d'Ivoire
- 310-07 - Sorne series devices for smalI power tapping from HVDC transmission systems
- 310-08 - GIS type mobile substation
- 310-09 - MV distribution from insulated shield wires of HV Iines. Experimental applications in Ghana
- 310-10 - Poste de transformation HT/MT prêt à poser
- 310-11 - HV substations for developing countries
3.2. POSSIBILITIES OF IMPROVING THE OPERATING OF EXISTING SYSTEMS
- 320-01 - Coopération en cours entre SENELEC et ENEL pour l'étude et la réalisation d'une structure de mesures et essais au Sénégal
- 320-02 - Téléconduite d'un réseau d'électricité africain
- 320-03 - Application of the new technologies to improved power system operation
- 320-04 - Le dispatching d'Abidjan dans l'exploitation du réseau électrique de la Côte d 'Ivoire
- 320-05 - Les possibilités d'améliorer l'exploitation des réseaux existants par des systèmes de télécommande
- 320-06 - Control strategy using under frequency load shed relays
- 320-07 - Implantation d'un centre de conduite du réseau au Bangladesh
3.3. NEW FORMS OF ENERGY AND ELECTRICITY GENERATION ON LOW POWER SYSTEMS
- 330-01 - Remote area power supply investigation into wind power
- 330-02 - Regenerative power generation with wood
- 330-03 - Solar energy for irrigation
- 330-04 - Electrical energy supply with application of storage equipment in an isolated power system
- 330-05 - Small is beautiful but smalI and compact is quite adequate
- 330-06 - Fonctionnement dynamique d'aérogénérateurs raccordés à un réseau électrique
- 330-07 - Mini-hydro stations feasibility in isolated villages
- 330-08 - Production d'électricité par gazéification du bois
- 330-09 - L'alimentation d'un site isolé par une centrale photovoltaïque : expérience de Kaw en Guyanne
- 330-10 - Design, construction and operation experience of a photovoltaic plant for village power supply
- 330-11 - Mixed conventional and alternative power generation for the supply of isolated areas
4. GENERAL CONSTRAINTS AFFECTING THE DEVELOPMENT
OF ELECTRIC SYSTEMS IN DEVELOPING COUNTRIES
4.1. HUMAN RESOURCES AND STAFF TRAINING
- 410-01 - FullI scale power plant simulators in NSW, Australia
- 410-02 - Staff training ln PLN distribution department, case of study of collaboration between two national electricity corporations
- 410-03 - Formation du personnel et de la main-d'oeuvre locale
- 410-04 - lnstitutional cooperation between the power sectors in Mozambique and Norway
- 410-05 - Planification des systèmes électriques des pays en développement - La formation des planificateurs
- 410-06 - L'Ecole Supérieure lnterafricaine de l'Electricité (ESIE) et le Centre des Métiers de l'Electricité (CME). Instruments adaptés aux besoins de formation des pays africains
4.2. FINANCING
- 420-01 - Contraintes générales affectant l'évolution des réseaux électriques des pays en voie de développement. Financement
4.3. MISCELLANEOUS PROBLEMS
- 430-01 - The gap between planning and realization of the electric power systems in the Third World countries
- 430-02 - Maintenance and stock management of electrical equipment in Somalia
- 430-03 - Problems and remedies of power line carrier communication system of developing countries
- 430-04 - Expansion of rural electrification
- 430-05 - Difficultés d'exploitation dues à l'environnement; les serpents sur les lignes à haute tension de Côte d'Ivoire
- 430-06 - La réalisation par l'EECI de l'électrification rurale en Côte d'Ivoire. L' exemple des "centres araignées"
- de Boundiali - Korhogo - Perkessedougou
- 430-07 - Constraints on the progress of electric power system in developing countries
- 430-08 - Fonctionnement d'un réseau électrique dans des conditions de déficit de puissance et d'énergie
- 430-09 - The development of electric power system and general constraints of the progress of electric power system in Iran
- 430-10 - Contraintes générales affectant l'évolution des réseaux électriques des pays en développement