Summary

♦ Session Delegates (Members and non-members) : access these materials for free via your Session registration account.

♦ Important note: The size of the ZIP file is very large. Make sure you have a very good Internet connection for downloading.


Contents:

Videos

General

  • Opening Ceremony
  • Opening Panel
  • Next Generation Network forum
  • Women In Energy forum (2 videos)

Study Committee B5

  • GDM: Protection and automation (2 videos)
  • Tutorial B5: Protection of the Power System with High Penetration of Renewable Energy Sources

Documents PDF

  • Group Discussion Meeting: Presentations and Text versions
  • General Report
  • Tutorial B5: Protection of the Power System with High Penetration of Renewable Energy Sources
Session Papers & Poster Presentations
  • 10100 - Functional Testing of virtualized and centralized Protection Systems
  • 10103 - Field testing, Experiences and Results with Line Differential and Teleprotection Applications in TDM/MPLS-TP Hybrid Networks
  • 10104 - Coordinating Zone Settings of Distance Protection with Reactive Power Capabilities and Voltage Support of Inverter-based Resources
  • 10105 - Performance of Distance Relays in the Finnish Power System under High Penetration of Converter-Connected Generation
  • 10106 - Demonstration of enhanced and virtualised Protection of the Distribution Network
  • 10107 - Experiences, Secondary Injection testing and Grid Studies on Distance Protection and Current and Voltage Harmonics during Power System Faults
  • 10204 - Integration and Application of merging unit and intelligent terminal in smart substation based on IEC 61850
  • 10261 - Process Interface Unit requirements related to industrial deployment
  • 10262 - IEC 61850 digital substations technologies applied to power plants
  • 10263 - Testing approach for Rte’s R#SPACE Protection Automation and Control System
  • 10265 - Review by WG B5.69 of published Experience Feedback on Process Bus Implementation
  • 10304 - Digital substation with process bus: grid operator and PACS manufacturer feedback 2 years after the commissioning
  • 10349 - Object Modeling of Process-near Interface Intelligent Electronic Devices in Digital Substations
  • 10367 - Interoperability of protection devices among a multi-vendor IEC 61850 process bus system
  • 10368 - SAS2021 Project: benefits of standardization on acceptance, commissioning, and field testing during the whole PACS lifecycle
  • 10419 - LPITs in High Voltage Switchgear and Field-testing of Relay Protection with LPIT Inputs
  • 10420 - Unified Grid Control Platform Requirements of Process Bus
  • 10421 - Quiet Revolution: How Low-Power Instrument Transformers and Digital Secondary Systems are Changing What is Possible
  • 10422 - Improving the Efficiency of Acceptance, Commissioning, and Maintenance Testing of IEC 61850 Based Digital Substations
  • 10423 - Experience in the UCA International Users Group Interoperability Tests
  • 10424 - Use of Detailed Real-Time System Models to Evaluate Relay Performance Impacted by High Penetration of Inverter-Based Resources
  • 10425 - Life-cycle Testing of Synchrophasor Systems
  • 10427 - Protection and Control of Active Distribution Systems
  • 10428 - Evolution of Testing Practices: A Utility's Experience
  • 10429 - Design and Testing of Distributed Fault Location, Isolation and Service Restoration Scheme for Open-loop Electric Distribution Systems using IEC61850 GOOSE
  • 10503 - Assessment of Time-Critical IEC 61850 Process Bus Communications in a Virtualized Protection and Control System
  • 10504 - DSAS Rollout Experience - Picking the Ripe Fruits
  • 10505 - Testing of Centralized Protection, Control and Advanced Automation for MV networks with DER
  • 10514 - Distance Protection Performance Evaluation with Process Bus by using Modular Merging Units
  • 10532 - Impact on Busbar Protection by mixed analogue Input Chains in digital Substations
  • 10628 - System Architectures for Virtualisation and Hardware Consolidation
  • 10629 - Implementation of the line differential protection in the 30 kV distribution network of i-DE
  • 10630 - Development and Implementation of a WAMPAC Algorithm for Detecting Real-Time Voltage Instability Phenomena in Electric Power Systems
  • 10631 - Challenges and perspectives for a new era of protection, automation and control systems through IEC 61850
  • 10632 - Implementation of an IEC 61850 MMS interface for Centralized Protection and Control (CPC) virtualized platforms
  • 10708 - Practical implementation of full Digital PACS in a Multi-vendor Environment
  • 10713 - IEC61850 Engineering of a Digital Substation: Common User Vision on Top-down Engineering
  • 10745 - Experiences with process bus technology for substation retrofit
  • 10746 - Practical experiences with process bus based transformer protection system
  • 10747 - PMU-based fault distance calculation in long radial feeders using an enhanced reactance-based approach
  • 10797 - The Experience of Commissioning and Initial Maintenance of Relay Protection on Operational Digital Substations with the IEC 61850 Process Bus
  • 10798 - A New Technological Approach for Commissioning and Operation of Relay Protection and Automation Systems
  • 10801 - SV-stream Processing in the Event of Synchronization Loss by Publishers
  • 10803 - Experience of the Field Testing of Power Units Control Systems
  • 10806 - Experimental Verification of Fault Location Technology in Power Distribution Networks with Complex Topology
  • 10807 - Pilot Operation of Transmission Lines Differential Protection with Information Exchange According to IEC-61850-9-2 (SV)
  • 10809 - Development and Pilot Operation of the Intelligent PAC System Using the Concept of Virtual IEDs and Migration of Functions
  • 10813 - Developments and Practical Experiences of Merging Unit
  • 10815 - Development and Commissioning of PACS for Operating Modes of the Power System Based on PMU Data
  • 10816 - Methods for Configuring, Testing and Inspecting Automatic Excitation Regulators for Synchronous Generators during Commissioning
  • 10844 - Experience and Challenges in the Practical Implementation of Four Digital Substations in Brazil
  • 10846 - Digital Substation: Lessons Learned by CPFL in Process Bus Application
  • 10847 - Automating commissioning tests, accepting remote maintenance, and guaranteeing inventory integrity using a Device Management System
  • 10848 - Commissioning Perspectives for the New Era of Transmission Line Protection Schemes: Historical Evolution and Future Expectations
  • 10849 - Time Synchronization Interoperability and Testing Challenges for Process Bus
  • 10850 - Practical approaches for improving reliability and availability of digital multivendor substations
  • 10851 - A Practical Approach to The Requirements and Strategies for Monitoring the IEC 61850 Process Bus in a Multivendor Test Platform
  • 10852 - How to Test Virtual Protection, Automation and Control Systems (vPACS)
  • 10853 - FAT and SAT Procedures from the Perspective of the Brazilian TSO
  • 10869 - Lab Environment for fully digital Substation Solution Validation - technical Solution and testing Solution
  • 10870 - A consistency validation Tool for IEC 61850 Substation System Integration Configuration
  • 10877 - A Study on the Development of Interoperability Test Automation System for Digital Substation
  • 10887 - Certification and On-site Calibration of Metering System Based on LPIT
  • 10969 - LPIT operational experiences and challenges in a Norwegian digital substation
  • 11003 - Advantages and Challenges in Implementing the IEC 61869-9 Standard versus IEC 61850-9-2-LE in the Digitization of the Right Bank Substation
  • 11019 - Joint-Development and Demonstration of an Adaptive Protection System at a German DSO – Practical Experiences and Lessons Learned
  • 11094 - Experience from integration, functional and performance testing of virtualised wide area protection
  • 11109 - Acceptance and Commissioning of a Wide-Area Broken Conductor Detection System for Distribution Networks
  • 11112 - Using process bus over substation boundaries with multi-vendor line differential protection
  • 11137 - Testing of Travelling Wave Fault Locators
  • 11142 - Experiences from a substation pilot project implementing process bus based partly centralized protection and control
  • 11146 - The Full Digital Substation Success in Vietnam
  • 11162 - Collaborative Engineering and Testing of Smart Grid Automation Applications
  • 11197 - A modern retrofit solution for induction disc overcurrent relays
  • 11217 - Efficiency Improvement in Testing: Maximizing Resources and Reducing Time with Digital Twins
  • 11220 - Assessment of Distributed and Centralized Protection: Comparison of Response Times for Protective Dynamic System on Process Bus
  • 11231 - Merging Unit Performance Evaluation and Issues for Multi-Vendor Configuration in Process Bus
  • 11322 - Performance of Distance and Directional Overcurrent protections in a HVDC connected Offshore Windfarm
  • 11387 - Case Study: IEC 61850 Process Bus-Based Protection System Applications For One and Half Breaker Bus System in NEPCO 400 Kv stations
  • 11403 - User-centric tools for engineering, commissioning and operation of protection and automation devices
  • 11418 - Protection instrument transformers characterization and modelling for travelling wave applications
  • 11423 - Introduction to IEC 61850-6-3 OCL: Machine-processable rules for validation of IEC 61850 XML-based files
  • 11439 - Transition from device management to application management for Protection & Control through virtualization and centralization
  • 11445 - How a well-designed, optimized time synchronization concept can increase the reliability and availability of a digital switchgear's protection system
  • 11451 - Performance of the Overcurrent Function in the Event of Loss of Information in the Process Bus Using a Merging Unit Developed in ATP-EMTP
  • 11456 - EMT Based Protection Coordination Study Considering M-SSSC FACTS Technology in the Atlántico Region of the Colombian Transmission System
  • 11457 - Interoperability Challenges in Multi-Vendor Digital Substations: PTP Time Synchronization and Profile Compatibility
  • 11458 - Enhancing Protection Schemes for Inverter-Based Renewable Generation in Transmission Networks
  • 11493 - Performance Test of Grid Protection Relay for Black Start
  • 11496 - Development and testing of response-based wide area SPS without telecommunication
  • 11497 - IEC 61850 Compliant N-1 Inter Trip Scheme Suitable for Japanese Connect and Manage
  • 11599 - Protection verification for HVDC connected wind farms
  • 11650 - Utility Experience of FEED for IEC 61850 Process Bus based Protection and Automation system for 765/400/220KV Greenfield Substation
  • 11656 - Impact of IEC 61869-9 Based Sampled Values on Network Optimization and Protection System Performance in a Process Bus Based Digital Substation
  • 11666 - Commissioning & Operational Experiences of Brownfield & Greenfield Process Bus Substations in POWERGRID
  • 11669 - A comprehensive approach towards implementing the Process Bus based Substation Automation system in Substations and its benefits.
  • 11676 - Plug & Play of Protection, Automation & Communication system with Portable SCADA for EHV Substations
  • 11745 - A wide Area protection coordination assessment for the Albanian transmission System
  • 11756 - Real-Time Simulations to Validate the Impact of m-sssc Devices on Protection Coordination in Power Systems
  • 11778 - Reliable Time Synchronization for IEC 61850 Substations by Distributed Time Sources and Visibility
  • 11788 - Experience and Challenge in Deploying the IEC 61850 Driven Digital Substation within Indonesia Utility Context
  • 11807 - Digital Transformation of the Power Grid and Smart Testing Solution for Commissioning and Maintenance
  • 11821 - Experience in Protection System Commissioning for Digital Substation Pilot Project in Thailand
  • 11901 - Current Practices of Acceptance, Commissioning and Field Testing for Protection, Automation & Control System in a Transmission Utility, its Efficacy and Benefits

Additional informations

Publication type Session Materials
Reference SESSION_2024_B5
Publication year
Publisher CIGRE
Study committees
  • Protection and automation (B5)
Price for non member 150 €
Price for member 100 €

Video

Session 2024 - SC B5 Package
Session 2024 - SC B5 Package