Summary

Contents:

Videos

General

  • Opening Ceremony
  • Opening Panel
  • Next Generation Network forum
  • Women In Energy forum (2 videos)

SC B1

    Group Discussion Meeting 1

    Group Discussion Meeting 2

    Workshop B1-B2-B4-C1 - Extra-long transnational transmission lines

    Tutorial - A new era of submarine cables

Documents PDF

Session Papers & Posters

  • B1_10106 - Fire Risk from XLPE Cables in Air
  • B1_10276 - Application of Fault Tree Analysis to Underground Cable Accessories
  • B1_10292 - Development of Economic and Environment-friendly 66kV Array Cable
  • B1_10294 - Technology of Large Length 500kV XLPE Insulated AC Submarine Cable
  • B1_10443 - Analysis of Failed Cable Termination: Role of Workmanship and Electrical Stresses
  • B1_10510 - Simulations of losses in armoured 3-core submarine cables using 3D FEM compared to measurements
  • B1_10511 - Lightning strike to ground – a case study about observed cable damages, risk estimation and protection method
  • B1_10512 - Lightning strikes to ground affecting underground power cables
  • B1_10538 - Failure cause analysis and prevention of subsea cable failures in a joint industry project (JIP CALM)
  • B1_10544 - Practical experience and modelling of the corrosion behaviour of the Aluminium metallic cable sheath
  • B1_10663 - Evolution of dry type outdoor cable terminations based on field experience
  • B1_10665 - Temperature monitoring and current rating computation for the Cluster Westlich Aldergrund
  • B1_10667 - Complex cable temperature monitoring within the largest commissioned offshore wind farm
  • B1_10668 - Validation of an Efficient 3D Finite Element Model for the Calculation of Losses in Three-Core Armoured Power Cables
  • B1_10689 - Development of Analytical Method for Power Cable Creepage Phenomenon in Duct
  • B1_10690 - Iof Cause of Breakdown and Replacement of 275 kV SCOF Cable by XLPE Cable in Japan
  • B1_10693 - Sequence Impedance of Submarine Cables
  • B1_10703 - Effect of Semi-Conducting Jackets on the Performance of Three-Core Armoured Power Cables
  • B1_10714 - Belgian experience with horizontal directional drilling (HDD) filling materials and thermal modelling of HDD
  • B1_10744 - Effective of Strategic Planning in the Restoration of a Submarine Cable Fault
  • B1_10774 - PD, temperature and acoustic measurement of Eleclink HVDC interconnector – anticipate failures to minimize service disruption and impact on train circulation
  • B1_10867 - Best practices for Partial Discharge Monitoring of HVDC Cable Systems and Qualification Tests
  • B1_10868 - REE´s commitment to partial discharge monitoring in its underground cable network
  • B1_10869 - Lessons learned in the maintenance of REE´s submarine lines
  • B1_10878 - Increasing underground cable pulling length – a way to improve cost efficiency and reliability of projects
  • B1_10881 - Decommissioning of a self-contained fluid-filled cable: operating method and risks mitigation
  • B1_10955 - Time to failure testing of model HV XLPE Cables in salt Water at high electrical AC Stress and Temperature
  • B1_10957 - Formation of Potentially Harmful Shrinkage Cavities During Operation of MassImpregnated Non-Draining HVDC Cables
  • B1_10958 - HVDC Cable Installation in Freshwater Lake (Suldalsvatnet)
  • B1_10960 - Instrumentation on HV Cable Systems for condition-based Maintenance
  • B1_10999 - Future long-distance AC XLPE submarine cable from Khanom to Samui Island. Guidelines to protect the cable against external hazards
  • B1_11073 - Advanced Analysis of Partial Discharges on Power Cables
  • B1_11164 - Experiences and Insights Rehabilitating a 69kV SCFF Cable System after Pressure Loss
  • B1_11165 - Developments towards a Risk Based Maintenance program to reduce fires at LV cable terminations and plastic enclosures
  • B1_10142 - Emerging Asset Management Strategies for OF Cable Technologies in North America
  • B1_10297 - Operational Simulation on ±100 kV/1 kA DC Superconducting Energy Pipeline for Energy Interconnection
  • B1_10359 - Development, Adjustment and Implementation of the HTS Transmission Cable Line (2.4 Km) in St. Petersburg
  • B1_10513 - Prequalification test of a 525-kV extruded DC cable system under special conditions: challenges and implications on cable system performance
  • B1_10514 - Transient Over Voltage Testing of Cable Systems in MMC-HVDC Links: A Concept Study Including Verification
  • B1_10642 - Development and site application of intelligent partial discharge and condition assessment system for underground transmission lines
  • B1_10691 - A Study of Quality Management System for Underground Transmission Lines by Japanese Transmission System Operators
  • B1_10879 - Maintenance and asset digitalisation with cable monitoring systems supervision
  • B1_10880 - Evaluation of the HVDC VSC cable system behaviour in presence of transient voltage phenomena
  • B1_10882 - Optimal energy management of offshore wind farms considering the combination of overplanting and dynamic rating – Results of the CELT4Wind project
  • B1_10939 - Identification of Partial Discharges in Cable Terminations using Methods based on acoustic, electromagnetic and electrical Measurements
  • B1_10961 - Single Point Bonding of 3-core Submarine Cables
  • B1_11028 - Performance and characterization tests on HPTE insulation material
  • B1_11070 - Combined Type Test of HVDC Cable System with Integrated DC GIS Components for U0 = ±525 kV
  • B1_11072 - Influence of Cabling on Harmonic Voltages in a Transmission Grid using an Exemplary Test Grid
  • B1_10692 - Replacement by utilizing existing Facilities for EHV Underground Transmission Lines
  • B1_10717 - Towards Sustainability: A Power Cable Industry Supplier’s Perspective
  • B1_10962 - Availability modelling of submarine high voltage Cable Systems

Workshop

  • Workshop B1-B2-B4-C1 - Extra-long transnational transmission lines

Tutorial

  • Tutorial - A new era of submarine cables

Opening Panel - Energy Transition Salient Aspects for the Power Industry

  • Session 1 - Energy Transition on Power Equipment
  • Session 2 - Changes in Planning and Design of Transmission and Distribution Systems
  • Session 3 - Re-designing regulatory & market tools considering sector coupling scenarios

General Report B1

Additional informations

Publication type Session Materials
Reference SESSION_2022_B1
Publication year
Publisher CIGRE
Study committees
  • Insulated cables (B1)
Price for non member 150 €
Price for member Free

Video

Session 2022 - SC B1 Package
Session 2022 - SC B1 Package