Summary
Contents:
Videos
SC B5
- 2020 - Paper Session 1 (2020.09.02)
- 2020 - Paper Session 2 (2020.09.02)
- 2020 - Paper Session 3 (2020.09.03)
- 2020 - Paper Session 4 (2020.09.03)
- 2020 - Tutorial: Guidelines for safe work methods in substations
- 2021 - GDM 1 (2021.08.26)
- 2021 - GDM 2 (2021.08.27)
- 2021 - Tutorial: Management of risk in substations
- 2021 - Workshop A3/B3: The impact of SF6 - Free alternatives in TD substations and its switchgear switching equipment
General
- 2020 e-session International NGN Activities Update and Discussion (2020.08.28)
- 2020 e-session_20200828_Women in Engineering_ Embracing Change and Overcoming Barriers(2020.08.28)
- 2020 e-session_20200903_closing speech from CIGRE President, Michel AUGONNET (2020.09.03)
- 2021 VCS Opening Ceremony (2021.08.20)
- 2021 VCS NGN (2021.08.23)
- 2021 VCS Women in Energy (2021.08.23)
2020 e-session Opening Ceremony (2020.08.24)
Documents PDF
Session Papers & Presentations
- B5-102 Prevention of Human Errors in Transmission Line Protection and Fault Location Functions by Eliminating the Need for Settings
- B5-103 Challenges and experiences of utilities in Brazil to new procedures and human resources management to reduce PAC systems risks in a new complex digital enviroment
- B5-104 Formal Methods to Power-System Automation
- B5-105 Human Aspects in Protection, Automation and Control Systems (PACS)
- B5-106 The challenge of tackling human errors in the PACS environment
- B5-107 Human Errors related to PACS: Experience and Expectations of Elia, the Belgian TSO
- B5-108 The central role of human resources in PACS Asset Management
- B5-109 Process bus based Busbar Protection – Easier Installation and Life-Cycle Management for the Digital Substation
- B5-110 Engineering and Validation Support Framework for Power System Automation and Control Applications
- B5-111 Common Errors and Traps in Design, Testing and Commissioning of Protection and Control Schemes
- B5-112 Human aspects related to IEC 61850 testing: How to believe or don´t believe in testing
- B5-113 Benefits derived from the use of Digital Twins of Protection and Control Systems
- B5-114 How to Improve Human Decisions with a PMU´S Automatic System for the Control of Stability of a HVDC Link in Red Eléctrica de España (REE)
- B5-115 The Decision Tree Forest for the Defects and Weak Points of Relay Protection Devices
- B5-116 Human Errors in Maintenance and Modification of Protection System in Thailand
- B5-117 Human aspects in testing and commissioning of digital substations, based on experiences from real installations
- B5-201 Model-Based Systems Engineering Views of Software Defined Process Bus Networks
- B5-202 Analyzing the Limits of Data Transmission in the Process Bus
- B5-203 Digitalization at Eletrobras Eletrosul – Challenges on fully digital substation PACS communication network architecture specifications
- B5-204 Best practices and challenges on designing a LAN communication network for 61850 Digital Substations
- B5-205 Test Systems Consideration in the Design of Communications Networks for Digital Substations
- B5-206 Architecture of Communication Network in Statnett Digital Substation
- B5-207 Experience gained and Recommendations for Implementation of Process Bus in Protection, Automation and Control Systems (PACS)
- B5-208 FITNESS: Live comparison of reliability and availability of different communication and redundancy architectures for digital substations
- B5-209 Development of Advanced Communication Unit for Ring Topology Network and Application to Special Protection Scheme
- B5-210 Implementation of Overload Protection Relay System based on IEC 61850 for Simplification of communication network
- B5-211 Data segregation and traffic anomaly detection within the transmission substations and the whole power system
- B5-212 Experience in organization of communication network PMU data transmission in protection, automation and control systems
- B5-213 IEC 61850 communications monitoring and diagnostics system implementation experience
- B5-214 Optimising LAN Architecture For Improved Reliability And Resilience
- B5-215 5G wireless communications for smart grid: a PACS case with network slice
- B5-216 Design constraints and choices for the LAN in RTE's R#SPACE system
- B5-217 Redundancy in the IEC 61850-Based Digital Substation System for KEPCO's 154kV Substations
- B5-218 Engineering and Management of Communication Networks in Powergrid's Full Digital Substations
- B5-219 Assessment of Dynamic and Programmable Network Redundancy Management Method based on Software Defined Network Technology in A Fully Digital Substation
- B5-220 Experience in Communication Network Design for High Performance Requirements in IEC 61850 Process Bus based Substation
- B5-221 Implementation of QOS in the process bus for Digital Substations
- B5-222 The ‘Protection over MPLS' project - Testing line differential protection and teleprotection over an IP/MPLS communication network
- B5-223 Pilot Experience of IEC 61850 real-time communication between digital substations enabling new protection and automation concepts in Al-Dhafrah in Transco Power system
B5-101 Impact of Standardization of PACS on Reducing Human Errors in Engineering and Testing
Tutorials - Documents
2020 Distribution Protection selected topics
2020 Reference 789 - Improved metering systems for billing purposes in substations
Summary Report
2020 SC B5
Additional informations
Publication type | Session Materials |
---|---|
Reference | SESSION_2021_B5 |
Publication year | |
Publisher | CIGRE |
Study committees |
|
Price for non member | 150 € |
Price for member | Free |