Summary
In this issue :
Edito
- How Working Groups work - By Rob Stephen, President of CIGRE
Global Connections
- CIGRE: A single port of call for end to end power system expertise!
- Navigating Canada’s Energy Transition
- Q&A with Merryn York, CEO Powerlink Queensland
Life of Association
- CIGRE Brazil - XVIII ERIAC - Foz do Iguaçu - May 19-23, 2019
- Clark GELLINGS, recipient of the Charles H. Percy Award for Public Service
- ISH - 21st International Symposium on High Voltage Engineering - Budapest - August 25-30, 2019
Annual Reports
- C4 - Power system technical performance
- C5 - Electricity markets and regulation
Reference Paper
- Defining power system resilience
Working Group Report
- WG A1.34 - Testing voltage of doubly-fed asynchronous generator-motor rotor windings for pumped storage system
Technical Brochures
- 772 - WG A1.37: Turbogenerator stator windings support system experience
- 773 - WG B1.52: Fault location on land and submarine links (AC & DC)
- 774 - WG A1.31: State of the art of stator winding supports in slot area and winding overhang of hydro generators
- 775 - WG C1.35: Global electricity network - Feasibility study
- 776 - WG A1.50: Factory quality assurance testing requirements for turbo-generator components – stator bars
- 777 - WG B3.42: Reliability analysis and design guidelines for LV DC auxiliary systems
- 778 - JWG C2/C5.05: Reliability standards and market rules related to maintaining reliability and market efficiency
Additional informations
Publication type | Electra |
---|---|
Reference | ELT_306 |
Publication year | |
Publisher | CIGRE |
Pages number | 108 |
Price for non member | 20 € |
Price for member | Free |