Preferential Subject 1 - Leveraging PMU data for better Protection, Automation and Control Systems
- B5_101 Disturbance free energy identification in Power Systems based on PMU
- B5_102 A Fault Location System of Distribution Line Based on Wide Area Synchronization
- B5_103 PMU optimal placement based on node set
- B5_104 Synchrophasor Measurements-Based Controlled Islanding
- B5_106 Real Time Digital Simulation of the Synchronized Phasor Measurement System: First Experience in Brazil
- B5_107 Applications and perspectives of Phasor Measurement Data
- B5_108 Synchrophasor Applications to Wide Area Monitoring, Protection, Automation and Control Systems (WAMPACS)
- B5_109 Synchrophasor Measurements for Power System Monitoring, Protection and Control under the Standard IEC/IEEE 60255-118-1
- B5_110 WAMPAC system as SIPS solution at ETESA
- B5_111 A novel method for screening the PMU phase angle difference data based on hyperplane clustering
- B5_112 Chilean ISO Experience employing a Wide Area Monitoring System during the Interconnection of two Large Power Systems
- B5_113 Implementation, Evolution and Applications of the Chilean Wide Area Monitoring System
- B5_114 POD Controller Design for the Existing TCSC in Indian System Using Remote Signal Obtained via PMU for Stability Improvement
- B5_115 Enhancing real time situational awareness at control centre during faults through Synchrophasor data
- B5_116 Implementation of a Wide Area Monitoring System for the Indian Power System
- B5_117 Use of PMU data for locating faults and mitigating cascading outage
- B5_118 Leveraging PMU data for condition monitoring of hydro generators
- B5_119 Automatic Voltage Regulators’ Efficiency Wide Area Monitoring System
- B5_120 Issues of Implementation of Automatics for Liquidation of Asynchronous Mode when Using PMU Data
- B5_121 Practical experience of post-mortem analysis by PMU data
- B5_122 Application of synchrophasor measurement technology for control, protection and automation
- B5_123 PMU application for Adaptive PACS development for distribution networks with renewables
- B5_124 PMU application for power system parameters identification for adaptive voltage and reactive power control system
- B5_125 Proposal of Synchronized Phasor Measurement Application on Monitoring Operation Conditions of the Itaipu Hydroelectric Power Plant - 60Hz Sector
- B5_126 System Integrity Protection Scheme Based on PMU Adaptive Power Swing Protection
- B5_127 Model-free fault location for transmission lines using Phasor Measurement Unit data
- B5_128 Implementation in Red Eléctrica de España (REE) of an Automatic System for the Control of Stability of an HVDC link.
- B5_129 Methods to improve the precision of PMU Calibration device
Preferential Subject 2 - Time in Protection Applications – Time sources and distribution Methods
- B5_201 Application and Test Analysis of IEEE 1588 in Smart Substation
- B5_202 Performance Evaluation of IEEE 1588 for Precision Timing in IEC 61850 Substations
- B5_203 Deployment and evaluation of PTPv2 in a PRP network
- B5_204 A Scheme to Eliminate Synchronous System Effects on Measuring Device in Smart Substation
- B5_205 Implementations and challenges in time synchronization of protection, automation and control systems: Experience and expectations of applications in Brazil
- B5_206 Time in IEC 61850 – Principles and Applications
- B5_207 Application and implementation of time synchronization of digital substation in China
- B5_208 Research on monitoring and testing of time synchronization
- B5_209 Implementation of time synchronization in the Statnett R&D project - Digital substation
- B5_210 Time Synchronisation for Travelling Wave Applications
- B5_211 Time Synchronisation Aspects and Technology Comparison for Digital Substations with Process Bus
- B5_212 Time Synchronization Methods for Protection And Control Systems
- B5_213 Redundant secure timing sources and timing distribution to digital power protection and control applications
- B5_214 Design and Analysis of PTP Time Synchronization for Multi-Vendor IEC 61850 Process Bus based Protection and Control Applications.
- B5_215 Estimation of relay protection time synchronization using data on analog values as per IEC 61850-9-2
- B5_216 Issues of implementation and application of the time synchronization subsystem in complexes of relay protection and emergency control, digital substation, WAMS
- B5_217 Application of synchronization methods by transients parameters for the implementation of a process bus according to IEC 61850
- B5_218 PTP Synchronization Performance Evaluation with Process Bus Load
- B5_219 Challenges and Benefits of a Unified Synchronism Network
Preferential Subject 3 - Future Technologies for Inter-substation Communication, Migrating Digital Teleprotection Channels to Packet-Based Networks
- B5_301 Line differential protection communication via MPLS based inter substation communication networks
- B5_302 Wide Area GOOSE Applications for Inter-Substation Communications
- B5_303 Line Current Differential Relay System Employing a Native Ethernet Communication Service
- B5_304 R-GOOSEs enhance relay communication schemes
- B5_305 Solving the Inherent Problem of Transporting Serial Teleprotection Circuits Over MPLS
- B5_306 Using Wavelength Division Multiplexing for Protection Applications
- B5_307 Migration from SDH/PDH to MPLS for Line Differential Protection
- B5_308 Challenges in the Use of PACS Channels over Packet Switched Networks
- B5_309 Data segregation and PACS requirements
Additional informations
Publication type | Colloquia |
---|---|
Reference | COLL_TRO_2019 |
Publication year | |
Publisher | CIGRE National Committee |
Study committees |
|
Price for non member | Free |