Summary
Following an initial pre-feasibility study on the global power grid concept, which highlighted the value of interconnections between continents for more efficient implementation of wind and solar power worldwide, an extension was carried out to consider alternative solutions such as storage and demand response. In addition, the commercial rules and governance issues of a global grid have been added to the scope.
Additional informations
Publication type | Technical Brochures |
---|---|
Reference | 938 |
Publication year | |
Publisher | CIGRE |
ISBN | 978-2-85873-643-0 |
Study committees | Power system development and economics (C1) |
Working groups | WG C1.44 |
File size | 16 MB |
Pages number | 233 |
Price for non member | 300 € |
Price for member | Free |
Authors
G.SANCHIS, Convenor (FR), Y.ZHANG, Secretary (CN)
N.CHAMOLLET (FR), A.ILICETO (IT), A.L’ABBATE (IT), D.RADU (BE), A.HUSNI (GB), K.BAKIC(SI), M.BRINKERINK (IE), C.SMITH (US), E.BUE (TR), M.AL-KADHEM (SA), M.AL-SHAIKH (SA), M.BEBAN (US), P.VAZ ESMARALDO (BR), O.BRENNEISEN (DE), J.CASPARY (US), JL.RUAUD (RDC), C.DIACONU (RO), L.BELEKE TABU (RDC), A.KUMAR (SE), J.HAN (CN), M.BERGER (BE), V.LAKIOTIS (GR), M.RANJBAR (IR), X.LENG (CN), A.OUDALOV (CH), D.PILENIEKS (RU), H.BERAHMANDPO(IR), U.BACHHIESL (AT), D.POZO (RU), M.ALOMARI (JO), XP.ZHANG (UK), K.BHAT (IN), J.VISQUERT (SP), E.SAUMA (CL), R.GAUGL (AT)