Summary
The work of WG B3.06/ TF-05 aims to fill the gap between data management, through information strategies, and the link with risk-based decision making. The TB establishes general principles for the information strategy (named the 'hourglass model') for substation level asset management; however, the discussed strategy can also be seen in a broader context. Basically, the hourglass model shows that there is a need to link information requirements with data requirements. In order to obtain such a link, it is necessary to have integrated data containing technical, economic, sociological information, and a well-defined enterprise-wide data model.
Additional informations
Publication type | Technical Brochures |
---|---|
Reference | 576 |
Publication year | |
Publisher | CIGRE |
Study committees |
|
Working groups | WG B3.06 |
File size | 2 MB |
Pages number | 93 |
Price for non member | 180 € |
Price for member | Free |