Summary

This TB explores the subject of achieving large capacity increases on existing transmission lines. It first touches the roles and interrelations of planners and designers and then discusses technologies that can be used to increase the capacity. At the end it shows the importance of the relationship between owners, operators and the public and its representatives.

Additional informations

Publication type Electra
Reference ELT_251_7
Publication year 2010
Publisher CIGRE
Working groups JWG B2/C1.9
File size 375 KB
Pages number 3
Price for non member 20 €
Price for member Free
Increasing Capacity of Overhead Transmission Lines: Needs and Solutions
Increasing Capacity of Overhead Transmission Lines: Needs and Solutions