Summary

This brochure provides a range of important information, which contributes to optimizing the construction cost of AIS substations from the conceptual engineering stage to project close out. A number of case studies are also included in the brochure to show how cost reductions have been achieved in practice by various utilities.

Additional informations

Publication type Technical Brochures
Reference 354
Publication year 2008
Publisher CIGRE
Study committees Substations and electrical installations (B3)
Working groups WG B3.15
File size 3 MB
Pages number 145
Price for non member 270 €
Price for member Free
Guidelines to Cost Reduction of Air Insulated Substations