Summary

Policies concerning the power sector have been changing in the recent past all around the world and the electricity supply industry (ESI) has entered a period of restructuring. In some countries the process has been almost completed, even if feedback from the experience could modify the "original" framework. In others it is still under way.

Additional informations

Publication type Technical Brochures
Reference 129
Publication year 1998
Publisher CIGRE
Study committees Power system technical performance (C4)
Working groups TF 38.03.11
File size 4 MB
Pages number 60
Price for non member 120 €
Price for member Free
Methods and techniques for reliability assessment of interconnected systems.
Methods and techniques for reliability assessment of interconnected systems.