Summary

WG A3.33 investigated the technical requirements for equipment relevant to series and shunt capacitor compensations. Series compensation technique has been widely used to increase transmission capability of EHV power transmission systems. This technique was recently applied to UHV power systems, and played an important role in increasing the transmission capacity of single UHV line to 5 GW.
he WG also studied the requirement for equipment applied to shunt compensation. TB provides the impact of both series and shunt compensation on transmission systems and equipment, and suggests some countermeasures to decrease potential risks for system and associated equipment based on the field experience.

Additional informations

Publication type Electra
Reference ELT_293_4
Publication year
Publisher CIGRE
Study committees
  • Transmission & distribution equipment (A3)
Working groups WG A3.33
File size 3 MB
Pages number 6
Price for non member 20 €
Price for member Free

Authors

Bathurst, Myung

Keywords

CIGREmagazine

Experience with equipment for series and shunt compensation
Experience with equipment for series and shunt compensation