Summary

The guide specifically addresses the magnitude of transferred Earth Potential Rise EPR to telecommunication systems due to faults in a.c. power systems and how to mitigate these effects. Examples of the EPR transfer mechanisms are described and suitable protection systems are discussed and a description of the factors that have to be considered for test and measurement. A list of published standards and recommendations is included.

Additional informations

Publication type Electra
Reference ELT_276_8
Publication year
Publisher CIGRE
Study committees Power system technical performance (C4)
Working groups WG C4.207
File size 2 MB
Pages number 4
Price for non member 20 €
Price for member Free
For assessment of transferred EPR on telecommunication systems due to faults in A.C. Power systems
For assessment of transferred EPR on telecommunication systems due to faults in A.C. Power systems