Summary
The guidelines to perform risk assessment on defects in GIS based on PD diagnostics are described in the brochure with reference to information available in the literature from laboratory, on-site and in-service measurements. The dielectric failure probability is calculated from a sensitive PD measurement and indicating type of defect and its location inside the GIS. The risk assessment is performed on the estimated dielectric failure probability and failure consequences. Examples of risk assessment are also provided.
Additional informations
Publication type | Electra |
---|---|
Reference | ELT_266_6 |
Publication year | |
Publisher | CIGRE |
Working groups | WG D1.03 |
File size | 654 KB |
Pages number | 5 |
Price for non member | 20 € |
Price for member | Free |