Summary

This article highlights the challenges and issues in the design, construction and operation of offshore substations for wind farm connections. A CIGRE working group has been established to examine these issues, provide guidelines and advise on best practice. Here we report on the early findings, principally the design challenges these substations present. Advice on managing these issues will be reported on in the TB to be published in 2011.

Additional informations

Publication type Electra
Reference ELT_253_1
Publication year
Publisher CIGRE
Working groups WG B3.26
File size 2 MB
Pages number 7
Price for non member 20 €
Price for member Free
The Challenges facing AC offshore substations for wind farms
The Challenges facing AC offshore substations for wind farms