Summary

Session Delegates (Members and non-members): access these materials for free via your Session registration account.

Additional informations

Publication type Session Materials
Reference C6-11702-2024
Publication year
Publisher CIGRE
Study committees
  • Active distribution systems and distributed energy resources (C6)
File size 908 KB
Price for non member 30 €
Price for member 20 €

Authors

Anastasis TSOUMANIS, Stefanos KOKKINELIS, Konstantinos NATSIS, Stavros PAPATHANASSIOU, Despoina KOUKOULA, Charalampos PAPPAS, Eleni LAMPRINIDI, Theodora PATSAKA

Keywords

Hybrid power, non-interconnected islands, Pelton turbine, deflector control, needle control, primary frequency response

The challenge of smooth cooperation of hydroelectric Turbines with thermal Units to provide FCR and aFRR in a Non-Interconnected Island
The challenge of smooth cooperation of hydroelectric Turbines with thermal Units to provide FCR and aFRR in a Non-Interconnected Island