Summary
The aim of the Working Group was to address the new challenges presented by on-site assembly, on-site rebuild, and on-site high voltage testing. New work techniques for large power transformers had to be developed in many countries due to restrictive transportation regulations. This technical brochure shows, by way of a collection of international experiences, some of the best practices and it summarizes the quality assurance system required to ensure the reliability of on-site work.
Additional informations
Publication type | Technical Brochures |
---|---|
Reference | 857 |
Publication year | |
Publisher | CIGRE |
Study committees |
|
Working groups | WG A2.59 |
File size | 13 MB |
Pages number | 130 |
Price for non member | 240 € |
Price for member | Free |
Authors
DEJ, ALGUACIL