Summary
The wide spread development and implementation of IEC 61850 based Substation Protection, Automation and Control Systems (SPACS) using predominantly GOOSE messages and client/server communications has raised the awareness of the industry regarding the benefits of communications based systems. At the same time, the last years have seen a significant change in the availability of stand-alone and embedded Non-Conventional Instrument Transformers (NCIT) with IEC 61850 sampled values interfaces.
For this reason, the testing of fully digital functional chains has become an important issue with the deployment of IEC 61850-based substations using Stand Alone Merging Units (SAMU), and/or NCIT and featuring both station bus (IEC 61850-8-1) and process bus (IEC 61850-9-2).
This Brochure covers all test related aspects of a fully digital SPACS and equipment, including NCIT/SAMU Certification tests, SPACS level Interoperability tests, Factory Acceptance Tests, Commissioning and Site Acceptance Tests and Maintenance tests after commissioning
Additional informations
Publication type | Technical Brochures |
---|---|
Reference | 760 |
Publication year | |
Publisher | CIGRE |
Study committees |
|
Working groups | WG B5.53 |
File size | 5 MB |
Pages number | 193 |
Price for non member | 300 € |
Price for member | Free |
Authors
VAKULENKO, EL-SEHIEMY