Summary

A likely model of the electrical Network of the Future and its prospective components, in the next 2-3 decades, until 2030-2040, with their consequences and requirements for protection and automation systems, followed by suggested potential solutions and follow-up investigations.

Additional informations

Publication type Technical Brochures
Reference 629
Publication year
Publisher CIGRE
Study committees
  • Protection and automation (B5)
Working groups WG B5.43
File size 9 MB
Pages number 110
Price for non member 210 €
Price for member Free

Keywords

Protection, Automation and Control System (PACS), functional integration, Low Power Instrument Transformers (LPIT), adaptive protection, Protection, Renewable Energy Sources (RES)

Coordination of protection and automation for future networks
Coordination of protection and automation for future networks