Summary

Practical guidelines are given to perform "remaining life management" on HV cables. The methodology for these guidelines is based on a combination of technical, economical and strategical criteria, resulting in recommendations about cable replacement or life extension program. In 7 case studies the proposed methodology is applied on practical cases to demonstrate the feasibility.

Additional informations

Publication type Technical Brochures
Reference 358
Publication year
Publisher CIGRE
Study committees
  • Insulated cables (B1)
Working groups WG B1.09
File size 3 MB
Pages number 126
Price for non member 230 €
Price for member Free
Remaining Life Management of existing AC Underground Lines
Remaining Life Management of existing AC Underground Lines