Summary

The Guide contains the main aspects to be taken into consideration in the assessment of insulation coordination during live working on overhead transmission lines; the basis rules and influence factors for the determination of the minimum distances to be maintained between parts at different potential, including the worker himself, are given as well as for the evaluation of the risk of insulation failure.

Additional informations

Publication type Technical Brochures
Reference 151
Publication year
Publisher CIGRE
Study committees Power system technical performance (C4)
Working groups WG 33.07
File size 3 MB
Pages number 72