Summary
This webinar summarises the work done in CIGRE WG C4.56 which subsequently published in the Technical Brochure 881. It discusses detailed and systematic whole-system power system modelling based on electromagnetic transient (EMT) simulation for large power systems with a high penetration of inverter-based resources (IBR) where the conventional phasor-domain simulation tools may fall short. The level of details to be included in an IBR EMT model to make it suitable for wide-area system impact studies is then discussed. Approaches for systematic development and testing of the whole-system EMT models is also discussed. Lastly, it presents several practical case studies on how these wide-area EMT models have been used across the world and the insight provided by them which could not have been otherwise provided by conventional phasor-domain models.
Additional informations
| Publication type | Webinars | 
|---|---|
| Reference | WBN044 | 
| Publication year | |
| Publisher | CIGRE | 
| Study committees | 
 | 
| Working groups | WG C4.56 | 
| File size | 4 MB | 
| Pages number | 62 | 
| Price for non member | 50 € | 
| Price for member | Free | 
Video
Speakers
J. STELIN, GROGAN, N. KUN DING
 
		 
    
        
                    