Order Publications

Reference: ELT_279_4


Upgrading & Uprating of Existing Cable Systems



The TB written by the WG B1.11 gives a simple step-by-step methodology with flowcharts in order to guide the engineer into an upgrading process of an existing UG cable system (uprating being considered as a subset of upgrading). The steps are described, from the definition of the target for upgraded situation, the assessment of the existing situation and the identification of issues, up to the selection of potential upgrading techniques, the evaluation of their impacts and the decision making. Practical examples are given. Conclusion is that each case is specific and must be studied with great care because of possible interference of parameters.

File Size: 328,8 KB

Pages NB: 3

Study Committee : B1 ?

WG (TF): WG B1.11

Year: 2015

FREE free
Non member
FREE free

Your AccountYour Account

Password forgotten


may download free of charge all publications including most recent ones

Non Members

may download free of charge publications over three years old and purchase all publications

For any questions in connection with the on-line library, contact:

Publications and Editions Manager