SELECT DISTINCT PLACE FROM V_PUB WHERE PLACE IS NOT NULL AND PLACE <> '' ORDER BY PLACE;

Order Publications

Reference: ELT_254_5

ELT_254_5
Type:
Electra
Title:

Refurbishment Strategies based on Life Cycle Cost and Technical Constraints

 
The TB provides guidelines / recommendations to utilities that are planning on defining an objective refurbishment strategy for secondary systems in substations. Driving factors for change, such as new technology for the replacement of secondary protection and control systems, along with experiences in several countries are detailed. A summary of several ways to calculate life cycle costs are described based on a combination of a risk and economical assessment.
 

File Size: 728,9 KB

Pages NB: 3

WG (TF): WG B5.08

Year: 2011

 
 
 
Download
Member
FREE free
Non member
20€ buy
 

Your AccountYour Account