Order Publications

Reference: COLL_CAL_2013

Type:
Colloquia
Title:

Colloquium - Calgary 2013

 

Abstracts

  • T1_01__CIGRE 273 : Planning for the Integration of HVDC Facilities
  • T1_02__CIGRE 277 : Design Aspects of the Eastern Alberta Transmission Line HVDC Project
  • T1_03__CIGRE 266 : Converter Technologies and Functional Requirements for Reliable and Economical HVDC Grid Design
  • T1_04__CIGRE 267 : SVC Design and Installation for Voltage Stability Enhancement
  • T1_05__CIGRE 312 : A Program for Automation of the Harmonic Impedance Calculations Required for the Specification of HVdc Links
  • T1_06__CIGRE 249 : Electromagnetic Transient Overvoltage Study of a Multi-Terminal VSC based HVDC System
  • T1_07__CIGRE 221 : Building a HVDC Bipole Scheme from one LCC Pole and one VSC Pole
  • T1_08__CIGRE 265 : An Ultra-fast Disconnecting Switch for a Hybrid HVDC Breaker
  • a technical breakthrough
  • T1_09__CIGRE 308 : Assessment of HVDC Transmission Line Transposition on Induction Issues due to AC/DC Lines Coupling in Common Transmission Corridors
  • T1_10__CIGRE 229 : The Service Reliability of Aging Power Transformers
  • T1_11__CIGRE 253 : Second Generation Computerized Maintenance Management Systems: A Critical Asset Management Tool
  • T2_01__CIGRE 231 : World’s First Deployment of Line Current Differential Protection (LCDP) Using Broadband Power Line Carrier (B-PLC) Technology
  • T2_02__CIGRE 256 : Protection Challenges and Solutions for Lines With Multiple Taps
  • T2_03__CIGRE 340 : Simplifying Protection System Design for Distribution Substations
  • T2_04__CIGRE 310 : IEC61850-9-2 Process Bus Implementation on IEDs
  • T2_05__CIGRE 306 : Comprehensive Functional Testing of a Synchrophasor Data Concentrator
  • T2_06__CIGRE 318 : SINGLE-POLE TRIP AND RECLOSE PRACTICAL CONSIDERATIONS AND INDUSTRY PRACTISE
  • T2_07__CIGRE 245 : Pipe-type cable failure Caused by Lightning & Water Induced Sand Blasting
  • T2_08__CIGRE 241 : Development of Fibre Reinforced Polymer Composite Cross Arms for Sustaining Transmission Lines
  • T2_09__CIGRE 234 : Locating Oil Leaks in the Submarine Power Cable Crossing the
  • Northumberland Strait
  • T2_10__CIGRE 316 : RESISTIVE SUPERCONDUCTOR FAULT CURRENT LIMITER DESIGN AND APPLICATION FOR EXTENDING CRITICAL ASSET LIFE
  • T2_11__CIGRE 208 : Leveraging Graphical System Design, Reconfigurable Hardware, and Knowledge Management to Develop an Advanced Asset Monitoring System for Large Hydro Generator
  • T3_01__CIGRE 240 : Harmonics from Home Appliances
  • T3_02__CIGRE 255 : AmpaCity Project – Advanced Superconducting 10 kV System Replaces Conventional 110 kV Cable System in City Center
  • T3_03__CIGRE 296 : Self-healing of Power Distribution Networks: Techniques and Deployment Challenges
  • T3_04__CIGRE 237 : Prioritizing Maintenance for Protection Assets (PA): Utilizing Decision Indices
  • T3_05__CIGRE 213 : Non-invasive acoustic testing and monitoring of power transformers
  • T3_06__CIGRE 333 : Non-Linear Finite-Element Analysis of Conductor Cables with Composite Core Mechanical Behavior
  • W1_01__CIGRE 319 : New Technological Approach to Simplify Pole Loading and CSA Structural Analysis Requirements
  • W1_02__CIGRE 235 : A Real Time Environment for Closed-Loop Testing of PMU-based WACS Schemes
  • W1_03__CIGRE 225 : Impact of transmission line transpositions onnegative sequence voltage unbalance
  • W1_04__CIGRE 254 : Planning for a New 500 kV Substation in Manitoba
  • W1_05__CIGRE 337 : Methods for Risk Assessment of SSCI Stability Issues Between RenewableGeneration and Series Compensated Transmission Systems
  • W1_06__CIGRE 271 : An On-line Distributed Slack Bus Model for the Interconnection of AlbertaPower Grid and WECC
  • W1_07__CIGRE 215 : Feeder Differential Protection over EPON for Smart Distribution Networks
  • W1_08__CIGRE 238 : Utilization of Histogram in Control of Aggregated Loads with Innate Storage
  • W1_09__CIGRE 284 : Integrated Tool for Static and Dynamic Security Assessment of Large Power Systems
  • W1_10__CIGRE 325 : Remedial Action Scheme Philosophies and Montana-Alberta Tie-Line
  • W2_01__CIGRE 239 : Advanced Tap Changer Control of Parallel Transformers based on IEC 61850 GOOSE Service
  • W2_02__CIGRE 344 : Version Control and Patch Management of Protection and Automation Systems
  • W2_03__CIGRE 338 : A study on effect of CT saturation on Low power CT/VT operateddigital over current relays
  • W2_04__CIGRE 218 : Does 1 + 1 = Redundancy?
  • W2_05__CIGRE 331 : Big Data = Big Challenges for Big Substations and Big Assets
  • W2_06__CIGRE 321 : Multi-Function High-Voltage Sensors – Key to Enhanced Power System Operation and Automation – a Technology Adoption Roadmap
  • W2_07__CIGRE 341 : Lessons Learned: Implementing an IEC 61850 Based Substation AutomationSystem
  • W2_08__CIGRE 332 : Substation Control and HMI at BC Hydro – Past, Present and Future
  • W2_09__CIGRE 242 : Clarifying the Impact of Meshed Conductors and AdditionalGrounding on Creating an Equipotential Zone
  • W2_10__CIGRE 274 : Estimating Ground Clearance Required for Induction on Vehicles
  • W3_01__CIGRE 289 : Performance evaluation and simulation of WiMAX capacity for distribution automation
  • W3_02__CIGRE 314 : Cognitive Radio for Smart Grid
  • W3_03__CIGRE 307 : Reliable Network Design and Architectures for Modern P&C Systems
  • W3_04__CIGRE 226 : An Ethernet Multiplexer for Protection and Control A CFE Case Study
  • W3_05__CIGRE 294 : Paradigm shift required to digitze modern grid
  • W3_06__CIGRE 283 : Using IEC61400-25 and IEC 61131 to Process Wind Farm Data
 

File Size: 20,1 MB

Year: 2013

Place: Calgary, Canada

 
 
 
Download
Member
FREE free
Non member
FREE free
 

Your AccountYour Account

Password forgotten

Members

may download free of charge all publications including most recent ones


Non Members

may download free of charge publications over three years old and purchase all publications

For any questions in connection with the on-line library, contact:

 

Publications and Edition Manager

publications@cigre.org