Summary

Scope of the TB is to update the Technical Brochure 194, published in 2001, discussing the civil construction and cable installation techniques implementing them with the review of existing and innovative methods for HV cable installation, including the review of the calculations and parameters necessary to perform design calculations for cable installation, such as pulling calculation and thermo-mechanical design. Mention is also made to general system design criteria. A new survey on the installation methods has also been included.

Additional informations

Publication type Technical Brochures
Reference 889
Publication year 2022
Publisher CIGRE
Study committees Insulated cables (B1)
Working groups WG B1.61
File size 10 MB
Pages number 372
Price for non member 300 €
Price for member Free

Authors

Chinosi, BUSBY

Keywords

insulated cables

Installation of underground HV cable systems
Installation of underground HV cable systems