Summary

The TB presents the challenges that system operators are faced with in today's electricity market environment where there is increased pressure to enhance the capacity in the electricity network for utilization by market participants, while at the same time there is an expectation from the society to have a very reliable power system.

Additional informations

Publication type Technical Brochures
Reference 534
Publication year 2013
Publisher CIGRE
Study committees Power system operation and control (C2), Electricity markets and regulation (C5)
Working groups WG C2/C5.05
File size 977 KB
Pages number 34
Price for non member 80 €
Price for member Free
Interaction between principles of transfer capacity calculation and market activity for enhanced system utilization
Interaction between principles of transfer capacity calculation and market activity for enhanced system utilization