Order Publications
Reference: 472

Type:
Technical Brochures
Technical Brochures
Title:
Primary / Secondary systeminterfacemodelling for total asset performance optimization
Secondary installations in HV substations are constantly involved in renewal processes and the life cycle difference between the primary and secondary devices complicates those activities. A revision of the current renewal strategy is needed which will even have an impact on the design of new substations and systems. A standardised interface between the primary and the secondary systems will help to cope with
these difficulties over the whole lifetime of the asset.
File Size: 1,8 MB
Pages NB: 64
Study Committee: B3 ?
WG (TF): WG B3.10
Year: 2011

Member
FREE 

Non member
130€ 
