Summary

A presentation of the results of a questionnaire survey on power system restoration, covering operator needs and the changing industry environment. Responses were received from 36 organisations all over the world and the analyses are presented in two parts: Part I - Business, which deals with organisational and strategic aspects of restoration and the influence of market liberalisation on restoration. Part II - Domain, which anlyses domain specific issues related to restoration: operator problems in restoration, ideal needs and their current availability and the gaps

Additional informations

Publication type Technical Brochures
Reference 208
Publication year
Publisher CIGRE
Study committees
  • Power system operation and control (C2)
Working groups WG 39. 01
File size 661 KB
Pages number 30
Price for non member 70 €
Price for member Free
The needs and environment of control centre operators during power system restoration - A benchmark questionnaire survey
The needs and environment of control centre operators during power system restoration - A benchmark questionnaire survey