Summary

  • The symposium deals with the following topics:
  • Supply to rapidly growing cities abnd areas
  • development of interconnections,national and international
  • supply to areas not yet industrialized
  • system planning issues and generation topics

The list of papers is available, please contact the Publications Team to select the papers you are interested in.

TOPIC 1

SUPPLY TO RAPIDLY GROWING CITIES AND AREAS

  • 100-01 A comparative analysis of major power system disturbaoces in the peoiosular Malaysia grid : lessoos for the new millenium. - C.S. GILL ; Z.Z. ABIDIN (Malaysia)
  • 100-02 Experiences with 400 kV and 220 kV emergency restoration system in India. - A.. KAPUR; L.N. AGRAWAL (lndia)
  • 100-03 Methods to increase thermal capacity of overhead power lioes. - R. STEPHEN (South Africa)
  • 100-04 Design options for passive fault current limiter. - H. KUREBAYASHI , M. MATSUURA ; Y. SUDOU (Japan) ; S. IHARA E.V. LARSEN , RA WALLING (United States)
  • 100-05 Minimising environmental impact of transmission systems. - J.FINN ; C.JONES (United Kingdom); Abdul NASIR (Malaysia)
  • 100-06 Adequate supply quality by means of differeot network concepts. - B. EHMCKE; M. HEYLAND (Gennany)
  • 100-07 lntegration of independcnt power producers in clectrical power systems of countries  with rapid industrialisation. Y. BOUFFIOULX , F. LINARD DE GUERTECHIN , PH. SAINTES , J. GHEURY; T. LEKANE (Belgium)
  • 100-08 Evolving strategies for resolution of power quality problems - A Malaysian experience. - A.W. ROHAIZAD B. SAWIR; A.  H. AHMAD JAAFAR; T.A. ZAHARUDIN; JASON ENG ; B.I. AMIR;  Y.  SALLEHHUDIN, V.WONG (Malaysia)
  • 100-09 Evaluation    of  reliability  indices       in distribution systems - Practical applica­ tion. A. EL-BADRI (Libya)
  • 100-10 Fourniture d'une qualité de la tension ciblée sur les besoins des clients et des process industriels.  E. SERRES ; N. BUCHHEIT B.CALANI, C. LEVILLAIN, G. TANNEAU, D.BOUDOU (France)
  • 100-11 Supply network for Malaysia's multimedia super corridor. - BAHARUM HAMZAH; HO PENG CHOONG ; M. J. MD RAFFLES (Malaysia); T. WATANABE;  M.AKAIKE(Jap an)
  • 100-12 Pollution accumulation treatment in 220kV Libyan eastern network. - O. S. ABDALLA(Libya)
  • 100-13 Application of appropriate and advanced technologies to enhance the security and reliability of the TNB power system in the new deregulated environment - DATO' SABARIAH SABTU    SATKUNARAJAH RAJENDRA  ;  ZAINUDIN  MOHD YUSOF   .   NORHASBI   A.   WAHAB (Malaysia)
  • 100-14 Reactive power planning for load compensation in  the peninsula Malaysia Power System. SATKUNARAJAH , RAJENDRA DATO'SABARIAH, SABTU NORHASBI A. WAHAB : ZAINUDIN M. YUSOF(Malaysia)
  • 100-15 Practical fault level mitigation in a rapidl)' growing power supply system - AMIR BASHAH BIN ISMAIL, DANlAL BIN MOHD NOÔR. ZAINOREN BIN SHUKRI  (Malaysia)

TOPIC 2

DEVELOPMENT OF INTERCONNECTIONS NATIONAL AND INTERNATIONAL

SUB-TOPIC 2.1 

  • 210-01 Problems encountered during the interconnection of large electrical networks. - V. DELCROIX (France)
  • 210-02 Reliability and  availability of multiterminal HVDC systems. - S. ALM (Sweden) ; M. HAUSLER (Germany) J.J.COCHRANE (United  States)
  • 210-03 The Chandrapur-Padghe HVDC bipole transmission. - G. ISACSSON (Sweden) Y.D. AMBEKAR ; T. ADHIKARI (lndia)
  • 210-04 Leyte-Luzon HVDC power transmission project.L.R. WILHELMSSON (Sweden) , F.S. CORREA (The Philippines); J.F. ALLAIRE(Canada)
  • 210-05 A next century's perspective on growth of electric power system of Japan. K. TAKAHASHI ; I. KURIHARA (Japan)
  • 210-06 How to prepare the practical operation of a new synchronous interconnection link between two power systems ? Case of the Egypt-Jordan Interconnection. Mr. YOUNES, Mr. YASSIN (Egypt); Mr. AZZAM ; Mr. AMRO (Jordan) ; J.Y. BUSSON; R. LE PORT; Mr.  FAUCON(France)
  • 210-07 300 MW TNB/EGAT HVDC inter­connection project - AB'LLAH SALLEH C.H.WONG (Malaysia) SAKDHNAGOOL (Thailand) E. LANDGRAF ; K. SADEK ; M. SCHWEGMANN ; C. BARTZSCH ; W.ZINK(Gennany)
  • 210-08 The economic impacts of energy trading in the forthcoming Chinese power market. - P. PRUVOT ; F.AMANDALY (France) ; J. BAI; M. CHOU (China)
  • 210-09 Viability of a national HVDC transmission ring in India. - MATA PRASAD    REBATI    DASS     S. CHAKRA VORTY  (India), G. ISACSSON C.-G.CARLSSON (Sweden)
  • 210-10 Outage management in the Southern Africa Power Pool (SAPP). - E. JOHNSON; H. LINDES; M.  COETZEE; T. V.D. WALT (South Africa)
  • 210-11 Capacity sales and optimal tie capacities between networks of a power pool. - MOSA  S.DEYAB (Egypt)

SUB-TOPIC 2.2

  • 220-01 How to ensure economic efficiency through power system planning in a competitive environment. - X. VIEIRA FILHO , B.G. GORENSTIN ; ·E.N. MESQUITA ; J.C.O.  MELLO  ;   A.G.C.MELO (Brazil)
  • 220-02 The development of an electricity market in Western Australia. - B. STEWART (Australia)
  • 220-03 Technical and institutional requirements for coordinated interconnection developments. - P.J. PALERMO  (United  States)

SUB-TOPIC 2.3 

  • 230-01 Stability considerations for back-to­ back DC interconnections between weak AC power systems. - N.R. WATSON ; C.P. ARNOLD ; J. ARRILLAGA (New Zealand) G.W.J.ANDERSON (Australia)
  • 230-02 Problèmes de planification et d'exploitation des lignes haute tension à longue distance dans le cas des réseaux électriques de pays en développement (exemple du Sénégal). A.NIANG (Sénégal); V.I. TCHEKHOV (Russie)
  • 230-03 Improvement of AC systems using HVDC. - D. POVH; J. RITTIGER; R.WITZMANN E.TELTSCH (Germany)
  • 230-04 Application of coherency-based dynamic equivalents in the interconnected   Brazilian  system. E.J.S. PIRES DE SOUZA ; N.J.P. DEMACEDO (Brazil)
  • 230-05 300  MW   TNB/EGAT HVDC interconnection project : control & protection performance tests using the PSCAD™ /EMTDC™ program. - ABDUL RAZIB,  MOHD HALIMI (Malaysia) ; D.P. BRANDT (Canada) ; W. ZINK , G. PLEWKA , F. KARLECIK-MAIER ; G. WILD ; H. MESSNER (Gennany)
  • 230-06 Enhancement of power system stability with synchronous DC  links. A.GOLE  D.A.  WOODFORD ; M. REFORMAT; X. WANG (Canada)
  • 230-07 On-line out-of-step prediction scheme using equal area criteria based on power angle curve estimation. - TAE KYOO  OH  , HAK  MAN  KIM  , YOUNG JU KIM ; HYO SANG LEE ;  EUI SUK SUH  (Korea)

SUB-TOPIC 2.4

  • 240-01 Power oscillations damping using the unified control of active and reactive power flow. - C. ALDEA , C. POPESCU; M. EREMIA (Romania) D. POVH (Gennany) ; L. GYUGYI J.P. KESSINGER (United States)
  • 240.02  Long distance AC power interconnections : a viable option with series compensation. - R. GRÜNBAUM H.Â.JÔNSSON, P.LINDBERG
  • 240.03 Interaction between DC current compensation control of TCR (Thyristor Controlled Reactor) and system background 2nd harmonie voltage. T. KUWABARA , T.YOSHINO; Y.NORO(Japan), D.GEDDEY (Australia)
  • 240-04 Reactive power compensation for 1>0wer system in rapidly industrializing countries. - W. BRAUN D. POVH (Gennany) ; L. GYUGYI , J.P. KESSINGER (United States)
  • 240-05 Application of thyristor controlled series  capacitor  for  damping  of electromechanical oscillations in Brazilian system. - M. NOROOZIAN (Sweden) ; C. GAMA (Brazil)
  • 240-06 Operating experience with static var compensators in the ESKOM transmission  network.  D.A. MARSHALL; P. DAVEL; H. MOHABIR ; J. HAMMAN, L. STUBBS (South Africa)
  • 240-07 An approach on the hierarchical control of a uoified voltage cootroller. D. PASCHOARELI JR (Brazil)
  • 240-08 SVC for mitigating 50 Hz resonance of a long 400 kV AC interconnection. A HAMM.AD (Switzerland) ; S. BOSHOFF:  W.C.  VAN DER  MERWEC. VAN DYK W. OTTO (South- Africa) U.H.E. KLEYENSTÜBER (Nanùbia)

TOPIC 3

SUPPLY TO AREAS NOT YET INDUSTRIALISED

  • 300-01 Planning the electrification of Cambodia. - M. PIEKUTOWSKI ; R. WIRASINHA ,  B.K. FLEMING(Australia) ; TY NORIN (Cambodia)
  • 300-02 A large industrial plant in isolated and grid-connected operation.  E. LERCH; P.ZAHERDOUST; K. BAUM­ GARTEN (Gennany)
  • 300-03 Change of system dynamic aftcr extension of an islanded power system. E. LERCH (Germany)
  • 300-04 Transmission of electricity from a conceotrated power plant to low load deosity areas versus local diesel generation. - A CLERICI ; A. LONGHI (Italy)
  • 300-05 Rural clectrification in developiog countries : towards a wide use of autonomous systems. - R. SOLER ; A SCHMITT; R. FRONIUS ; G.MARBOEUF  (France)

TOPIC 4

SYSTEM PLANNING ISSUE

  • 400-01 Operatiog experience of first +/- 500 kV hi-pole HVDC long Hoe (830 kms long) in India - A study report. - A.K. KAPUR; L.N. AGRAWAL (lndia)
  • 400-02 Feasibility of large scale cootrolled islaoding for the TNB power system. DATO'SABARIAH   SABTU CHARANnT SINGH GILL BAHARUM HAMZAH (Malaysia) ; T. WATANABE  (Japan)
  • 400-03 Integration of large power plants into the transmission system. - E. LERCH .K.H. SCHILLING (Germany)
  • 400-04 Development of the synthetic system planning support system for power system planning. - K. IRIKURA ; K. NAlTO  ; T. SUGIYAMA  ; S. ONO (Japan)
  • 400-05 Improvement of supply quality in power system network of a rapidly industrialising    country. R.K AGGARWAL   (lndia)   ;  D.  POVH (Germany)
  • 400-06 Formation et développement de l'expertise locale - Apport d'une bonne politique de formation - YAO K. LATAILLE (Côte d' Ivoire)
  • 400-07 Methods and tools for financing projects in deregulated hydrothermal systems. - P.R.R. PINTO ; X. VIEIRA FILHO; A.C.G. MELO : S.NILO G. FARIA  M.S. REIS.;  B.G. GORENSTIN (Brazil
  • 400-08 Search for optimal technological option for power system expansion in India : a great challenge. I.S. JHA ; Y.K. SEHGAL; M. GUPTA (lndia)
  • 400-09 A holistic view of power system projects in rapidly industrialising countries. B. CORDEROY ; J. HOORE (Australia)
  • 400-10 Transfer of technology - Experience for HVDC transmission in China. - A. HAMMAD (Switzerland) ZENG QINGYU (China)

TOPIC 5

GENERATION  TOPICS

  • 500-01 Characteristics of new generation systems.  J.A.    OLIVER    ,  M.J. SAMOTYJ (United States)
  • 500-02 South China integrated generation expansion studies. - LIN TINGWEI JIN XIAOMIN (China)
  • 500-03 IEC's contribution to the use of renewable energy sources. - H. TEICHMANN (Switzerland)
  • 500-04 Reliability assessment of isolated power systems considering the impact of high wind power penetration. E.N. DIALYNAS ; N.C. KOSKOLOS I.G. VLANTOS ; D. AGORIS (Greece)
  • 500-05 Optimum planning and system design of thermal power plants. - SUSAN DAVARl (Iran)
  • 500-06 DC fceder for connection of a wind farm. - K.H. S0BRINK , P.L. SÔRENSEN ; P. CHRISTENSEN ; N.ANDERSEN (Denmark) K. ERIKSSON ; P. HOLMBERG (Sweden)
  • 500-07 A heuristic approach to generation­ transmission expansion planning. T. UEHARA , A. SUZUKI , K. OGIMOTO ; H. AZUMA; T. SAlSHOJI; S. FUKUTOME ; L. CHEN (Japan)
  • 500-08 Long transmission of electricity from cheap gas resources versus gas transport and local generation.  A. CLERICI ; A. LONGHI (ltaly)
  • 500-09 lsolated appplication of photovoltaic driven single phase self - excited induction generator. - M. KALANTAR (Iran)
  • 500-10 Environmental impacts of Iran power plants.  M. GHIASSEDIN (Iran)

Additional informations

Publication type Symposia
Reference SYMP_KUA_1999
Publication year 1999
Publisher CIGRE
Pages number 5