The scope of the questionnaire was to collect and compare worldwide best practices on uprating and/or upgrading works on overhead transmission lines in order to assess the reasons, the design requirements and the results achieved.This TB describes the correlation noticed between actions such as increasing transmission capacity and structural reliability, improving line performance and extending remaining life.The methods and tools for uprating/upgrading are summarized. Finally some didactic cases are provided as well as the remarkable results from the statistical analysis of the results.

Additional informations

Publication type Technical Brochures
Reference 294
Publication year 2006
Publisher CIGRE
Study committees Overhead lines (B2)
Working groups WG B2.06
File size 1 MB
Pages number 102
Price for non member 190 €
Price for member Free
How overhead lines are redesignd for uprating/upgrading-Analysies of the replies to the questionnaire.
How overhead lines are redesignd for uprating/upgrading-Analysies of the replies to the questionnaire.