Summary

The scope of the WG is defined on three main subjects : 1. Voltage levels for transmission, sub-transmission and distribution systems; 2. Size and density of substations and transformer capacities; 3. Architecture of transmission, sub-transmission and distribution networks. This report is meant to be an executive summary of the work carried out. The Group produced four main technical reports which are added as appendices.

Additional informations

Publication type Technical Brochures
Reference 099
Publication year 1995
Publisher CIGRE
Study committees Power system development and economics (C1)
Working groups WG 37.07
File size 8 MB
Pages number 156
Price for non member 290 €
Price for member Free
Interaction between transmission and distribution system planning.
Interaction between transmission and distribution system planning.