Order Publications

Reference: SESSION2016

Session Papers & Proceedings




This set records the papers + proceedings discussed at the 2016 Session (Session 46) :




PS1 : Developments of Rotating Machines and Experience in Service

  • A1-102 : Fatigue Assessment in the Pole Fixation of Hydro-Generators
  • A1-103 : Adjustable speed pumped storage system contributing in stabilization of power system
  • A1-104 : Upgrade from the fixed speed to adjustable speed (Okutataragi Pumped storage power plant)
  • A1-105 : Ensuring High Quality Insulation System Of Large Motors – Design & Testing Requiring
  • A1-106 : Efficiency and Cost-effectiveness comparison between Synchronous Reluctance Motor and Induction Motor
  • A1-107 : Root Cause Analysis of 450 MVA generator stator core fault
  • A1-108 : Impact of turbogenerator uprating on its transient response in case of grid events
  • A1-109 : Improved Generator Performance with a Nanocomposite High Voltage Insulation System for Stator Windings – A Status Report
  • A1-110 : Flexible Generator-Converter System with Enhanced Grid Support Features - Design and Applications
  • A1-111 : Voith Hydro's experience with the aging of insulation
  • A1-112 : Loss reduction of salient pole synchronous generator damper winding by means of slot skew
  • A1-113 : Optimized design of 4-pole Turbo Generator 2235 MVA platform
  • A1-114 : analytical and Numerical Computation of Wound Fields Synchronous AC Generators
  • A1-115 : Calculation and Analysis of Dynamic Damper Bars Currents and Electromagnetic Force for a Generator-Motor Working as Synchronous Condenser
  • A1-116 : Development of Larger Output Indirectly Hydrogen-cooled Turbine Generator with High
  • Heat Transfer Main Insulation


PS2 : Asset Management of Rotating Machines

  • A1-201 : Brazilian Experience with Development and Deployment of an Online PD Monitoring System on Rotating Machines Based on Virtual Instrumentation
  • A1-202 : Progress in Interpreting On-line Partial Discharge Test Results from Motor and
  • Generator Stator Windings
  • A1-203 : Assessment of manufacture quality of stator windings insulation of rotating machines by means of macrographic analysis


PS3 : Rotating Machines for Renewable and Dispersed Generation

  • A1-301 : Development of a Methodology for the Design of Axial Flux Microgenerators



PS1 : Advances in transformer diagnostic and monitoring

  • A2-101 : Remote Monitoring System and Analysis of Equipment Performance for Asset Management
  • A2-102 : Determinants of Transformer Life and Sophistication of Deterioration Diagnosis Corresponding to Aging
  • A2-103 : Smart Monitoring of Power Transformers: Project Update
  • A2-104 : New Online Vibro-Acoustic Tap-Changer Diagnostic Method – First Results and Practical Experience
  • A2-105 : Denoising of UHF Signals based on RBPF and the Localization of PD Sources using FDTD Method in Power Transformer
  • A2-106 : Advanced Dissolved Gas Analysis(DGA) Diagnostic Methods with Estimation of Faultocation for Power Transformer Based on Field Database
  • A2-107 : Condition Assessment of Power Transformers in service using PD Monitoring
  • A2-108 : Diagnosing difficult transformer problems using online condition monitoring
  • A2-109 : Condition monitoring and diagnostic assessment of transformers
  • A2-110 : Transformer Health Index and Probability of Failure Based on Failure Mode Effects Analysis (FMEA) of a Reliability Centered Maintenance (RCM) Program
  • A2-111 : Parameters influencing Partial Discharge Measurements and their Impact on Diagnosis, Monitoring and Acceptance Tests of Power Transformers
  • A2-112 : Assessment of Methanol as cellulose aging marker in mineral and ester oils
  • A2-113 : Expert System of Monitoring, Diagnostics and Control for Transformers (ESMDU_TRANS)
  • A2-114 : Improvements of Large Power Transformer Condition Real Time Monitoring and Diagnosis Expert System – a Romanian Experience
  • A2-115 : Interpretation of Results of Diagnostics of Power Transformers by Using the Frequency Response Analysis
  • A2-116 : Dynamic Behaviour of Fault Gases and Online Gas Sensors


PS2 : EHV / UHV and EHV DC / UHV DC Transformers and their components

  • A2-201 : Evaluation Method of VFT Stresses for Power Transformer Winding Design - Interaction Experience Between Manufacturer and Utility
  • A2-202 : Establishing Power Transformers Capability while under Geomagnetic Disturbances
  • A2-203 : 3 Phase 420 kV Shunt Reactor manufacturing and quality sensitivity for vibration control – A case study
  • A2-205 : The proposal of permissible vibration level for power transformer and its accessories
  • A2-206 : Short Circuit Design Conception and Validation of a 570 MVA, single-phase GSUTransformer by SC-Withstand Tests on a Mock-up Unit
  • A2-207 : Advanced designs of variable shunt reactors with on-load tap-changers for wider regulation range
  • A2-208 : Large Power Transformers using Alternative Liquids - Experience in the range of 420 kV transmission level
  • A2-209 : No-load long duration test experience to test the thermal performance of the transformer magnetic core
  • A2-210 : Research and Application of UHV AC Transformers and Shunt Reactors
  • A2-211 : Fast Response Thyristor Controlled Shunt Reactor. Development and Application Experience


PS3 : Transformer windings

  • A2-301 : Accelerated Transformer Aging using Upgraded Kraft and Natural Ester Insulation System
  • A2-302 : Post-Failure Evaluation of Dielectric Performance of Winding of 38-y.o. Transformer Enhanced by On-Line Moisture Monitoring
  • A2-303 : On-site replacement of OLTC, drying of winding insulation, induced voltage test with PD measurement of 250 MVA, 400/110 kV, 40 years old transformer
  • A2-304 : Experiences and innovations in transformer short-circuit current withstand testing
  • A2-305 : Design of 154kV power transformer using natural ester oil
  • A2-306 : A Study on Inflammable Gas Generation according to Small Gap Discharge within Floating Electrodes by Induced Voltage in Power Transformer
  • A2-307 : Dry-type subtransmission transformer: dry power transformers for the 123 kV and 145 kV voltage class
  • A2-308 : Short-circuit testing of 66 kV / 34 MVA dry-type power transformer
  • A2-309 : Evaluation of the Thermal Performance of Transformer Windings by Numerical Investigations and Measurements
  • A2-310 : Novel Thermal-Hydraulic Network Model for Shell-Type Windings. Comparison with CFD and Experiments
  • A2-311 : Influence of the Lightning Impulse Shape on the Electrical Stresses on Windings Insulation of Power Transformers and Shunt Reactors




PS1 : High voltage equipment for emerging power system conditions

  • A3-101 : Overview of Non-intrusive Condition Assessment of T&D Switchgear
  • A3-102 : Reduction of the TRV for Terminal Circuit Breakers on Series Compensated Lines
  • A3-103 : Survey on Requirements for Bus-transfer Current Switching
  • A3-104 : Voltage and Current Measurements for Smart Applications in Substations at Hydro-Québec
  • A3-105 : Development of high voltage vacuum interrupter with earthed metal enclosure for the transmission line
  • A3-106 : Development of HVDC Circuit Breaker with Fast Interruption Speed
  • A3-107 : Switching transients with simple transformer-line/cable configurations
  • A3-108 : New test-methods for circuit breakers of 800kV and above
  • A3-109 : Test-circuits and testing of HVDC circuits breakers
  • A3-110 : Very fast transient over voltages on paper oil insulated inductive voltage transformers
  • A3-111 : Inductive voltage transformers for auxiliary services power supply in substations. Design, specification and normative aspects and application example
  • A3-112 : Arresters with advanced cooling performance for protection of valves in HVDC converters
  • A3-113 : Environmentally Friendly Perfluoroketones-based Mixture as Switching Medium in High Voltage Circuit Breakers
  • A3-116 : Transient behaviour of conventional and innovative capacitive voltage transformers: simulations and HV laboratory testing
  • A3-117 : Research and Development of a Full-bridge Cascaded Hybrid HVDC Breaker for VSCHVDC Applications
  • A3-118 : The Establishment of Standard System for Accuracy Measurement of Harmonics of Electronic Voltage Transformers
  • A3-119 : In-adequate Damping Leading to Ferroresonance on Voltage Transformers: A Case Study


PS2 : Lifetime management of transmission & distribution equipment

  • A3-201 : Challenges for managing overstresses and end of life of HV equipment
  • A3-202 : Investigation on Contamination Deposit Performance and Pollution Withstand Voltage Characteristics of Polymer Devices
  • A3-203 : Transformation in Lifetime Asset Management of EHV Circuit Breakers – A Case Study
  • A3-204 : Contactless thermal online-monitoring of electrical equipment under load to determine the load level and damage avoidance
  • A3-205 : D-Watch – intelligent disconnector mechanism for digital substation


PS3 : Applica tion of information technology tools for development & management of high voltage equipment

  • A3-301 : Coupled Fluid-Mechanical Analysis Method in High-Voltage Circuit Breakers Design
  • A3-303 : Reduced scale feasibility of temperature rise tests in substation connectors
  • A3-304 : Power quality enhancement through optimum combination of controlled switching and low scatter CB drives
  • A3-305 : Mathematical and physical models development for study the high-voltage resistive dividers of digital voltage transformers




PS1 : Feedback from newly installed or up graded cable systems

  • B1-101 : Implementation Measures: An Overhead Transmission Line moves to Underground Transmission Line
  • B1-102 : Adoption of premolded joint and specialized cable installing method for the 275 kV XLPE cable underground transmission line in a tunnel
  • B1-103 : 220kV North Auckland and Northland (NAaN) Project in Auckland, New Zealand
  • B1-104 : Monitoring and up-gradation of Underground Cable Network by various methods
  • B1-105 : Mutual Inductive Interference of 400 kV Cable Systems
  • B1-106 : BC Hydro Experience to mitigate a hot spot along a 230kV XLPE cable circuit using a novel cooling solution
  • B1-107 : Development of AC 400kV XLPE Submarine Power Cable System
  • B1-108 : Location of sheath voltage limiters (SVLs) used for accessory protection to assure the insulation coordination of cable outer sheath, sectionalising joints and terminations of high voltage cable systems
  • B1-109 : Cable system qualification process for the Italy - France HVDC intertie


PS2 : Best use of existing cable systems

  • B1-201 : Maintenance Strategies Developed for the Underground Transmission Systems of ISA - Interconexión Eléctrica
  • B1-202 : Utility Experience with Field Condition Assessment of High Voltage Underground Cable Systems
  • B1-203 : Field Testing of high Voltage Cable: The Experience with AC Test on 115 kV Cables in MEA Thailand
  • B1-205 : Learning from on-line monitoring of medium voltage power cables – with PD and fault location
  • B1-206 : Measurements and FEA results of steel armour losses in three-core submarine XLPE cables
  • B1-207 : Improvement of Dissolved Gas Analysis Technique for Oil-Filled Cable Facilities and Practical Application of Gas Analysis Technique to XLPE Cable Facilities
  • B1-208 : Development of a Robot for Maintenance Work in the Spanish-French Electrical Interconnection Tunnel
  • B1-209 : Sheath currents monitoring in high voltage isolated cables
  • B1-210 : Transmission capacity management of subsea cables for the grid connection of offshore wind farms
  • B1-211 : Maintenance strategies for MV/HV subsea cable networks
  • B1-212 : Life Cycle Assessment (LCA) of a 380 kV double circuit HVAC cable transmission line
  • B1-213 : Belgian experience with real time temperature system in combination with distributed temperature sensing techniques
  • B1-214 : Fire Safety of Cables in Power Grid: Tracking Combustion Test Standards of Cables and New Insights on Test Framework
  • B1-215 : Submarine Cable Location. New technology – development and testing
  • B1-216 : Current Rating and Risk of Cavity-Induced Breakdown in Mass Impregnated Non-Draining HVDC Subsea Cables
  • B1-217 : Application of Partial Discharge Diagnostic technique on High Voltage Cable sealing ends to predict catastrophic failures with supportive case study


PS3 : Insulated cables in the Power System of the Future

  • B1-301 : A new voltage level for extruded DC cables
  • B1-302 : Development of the Riser Cable System for Offshore Floating Wind Power Project
  • B1-303 : Systematic Description of Dynamic Load for Cables for Offshore Wind Farms. Method and Experience
  • B1-304 : Understanding losses in three core armoured submarine cables
  • B1-306 : Use of aluminium for Cable Conductors and sheaths in EHV power cable systems
  • B1-308 : Simplified Undergrounding of 400 kV Overhead Lines with Superconducting Cable Systems
  • B1-309 : After Laying Tests on Long HVAC and HVDC Extruded insulated Cable Systems
  • B1-310 : 400kV – 2 x 1000MW Submarine Cable Crossing of the Dardanelles Strait
  • B1-311 : Optimization of Submarine Cable Structure Based on Ampacity
  • B1-312 : The world longest and deepest 430 kV XLPE submarine cable
  • B1-313 : Thermal characterization of seabed along the NordLink cable route – results and comparison of measurements methods
  • B1-314 : Effect of Water Pipeline on Ampacity of Underground Cables: Case Study




PS1 : Overhead Lines for high power transfer capacity

  • B2-101 : HVDC ±800 kV Transmission Line Associated to the Belo Monte Hydroelectric Power Plant - Studies and Definitions for the Basic Design - Innovation and Challenges for a New Level of Voltage in Brazil
  • B2-102 : Increasing the transfer capacity of overhead lines on the connection of wind power plants, through correlation between climatic data and temperature of conductors at higher currents
  • B2-103 : Prospective DC Conversion of a Major 345 kV AC Line
  • B2-104 : Assessment of HTLS Conductors to Increase the Power Transfer in the Mexican Electric Transmission System
  • B2-105 : Operational aspects of dynamic line rating. Application to a real case of grid integration of wind farms
  • B2-106 : Compact lines with pivoted insulated cross-arms. General stability design criteria
  • B2-107 : A 500 kV HVAC circuit reconversion into a +/-500 kV HVDC bipole line in the Central Interconnected System (Chile)
  • B2-108 : Verification of thermal rating calculations for high temperature low sag (HTLS) conductors
  • B2-109 : Assessment on the ignition of electric arc and flashover distances between overhead transmission lines and the surrounding vegetation
  • B2-110 : Monopole 220 kV tubular tower of steel tubes and cast steel without visible connections.
  • B2-111 : Operation Experience of 1000 kV Ultra High Voltage AC Transmission Technology
  • B2-112 : Design Verification by Analysis of Transmission Lines Exposed to Large Topographic Variations, Temperature Changes and Extreme Ice Loads
  • B2-113 : Design and engineering of a new 525 kV HVDC line in Norway
  • B2-114 : Monitoring and forecasting ice loads on a 420 kV transmission line in extreme climatic conditions
  • B2-115 : Compact controllable 110 – 500 kV overhead lines


PS2 : Project management, construction and maintenance

  • B2-201 : Calculation Accuracy of High-Temperature Sag for ACSR in Existing Lines
  • B2-202 : The Development of Electric Wires of High Tensile Strength and Corrosion Resistance, and Their Application to Renewal of 500 kV Long Span Transmission Lines Crossing the Strait
  • B2-203 : Innovation in Evaluating and Managing the Reliability of Aged Transmission Structures
  • B2-204 : Execution Of Transmission Projects With Innovative Methods For Augmentation Of EHV Network In Mega City Of Mumbai – Challenges & Solutions
  • B2-205 : A New Model for Developing, Constructing, Financing and Operating Major Transmission Projects in Alberta
  • B2-206 : A portable digital X-Ray system for the in-situ detection of ACSR broken strands at suspension clamps: field results and introduction onto Line Scout Robotic Technology
  • B2-207 : The new tower lifting method for the 345kV transmission lines
  • B2-208 : Research into an increased number of unexplained line outages of polymeric insulator sets used within the Czech transmission grid
  • B2-209 : Improved Efficencies in Conductor Stringing
  • B2-210 : A novel HTLS thermo-mechanical model: applications to Italian OHTL.
  • B2-211 : Real Time Measurements for Online Monitoring and Intelligent Management of High Voltage Transmission Lines
  • B2-212 : Condition Assessment of Overhead Line Convertors by the Pulse Current Method


PS3 : Application of new materials and technologies

  • B2-301 : Innovation-Section: test-run for uprating 220 kV to 380 kV using insulated cross arms and coated conductors
  • B2-302 : Testing Steel Lattice Towers with a Hybrid (Numerical / Experimental) Method
  • B2-303 : Development of Estimating Method for Conductor corrosion and High corrosion resistant Conductor for overhead transmission lines
  • B2-304 : Appropriateness of concrete poles for 400 kV Wintrack II
  • B2-305 : Temperature Profile along an Overhead Line Conductor in and near the Tension Clamp
  • B2-306 : Comparative Investigations of Hydrophobicity Effects and Erosion Resistance of Silicone Rubber used for Housings of AC and DC Insulators
  • B2-307 : CompactLine – a new Overhead Transmission Line Concept
  • B2-308 : A new design of high voltage overhead line using composite poles
  • B2-309 : Design, testing and installation of innovative 380 kV Dutton–Rosental towers
  • B2-310 : Development of 1250mm2 Large Cross-Section Conductors for UHV DC Transmission Lines
  • B2-311 : Proposals for additions to IEC requirements intended to verify quality of glass cap and pin insulators
  • B2-313 : Corona noise comparison of the standard and surface treated conductors obtained with monitoring of the newly erected 400 kV line and with corona testing in high-voltage laboratory




PS1 : Advances in substation technology

  • B3-101 : Non-Conventional Instrument Transformers for Improved Substation Design
  • B3-102 : Ceramic and Hybrid Support Insulators for UHVDC Systems
  • B3-103 : Substation Automation from Conventional to full Digital Technologies – Case Studies and Impact
  • B3-104 : High Power Underground Transmission for HV DC
  • B3-105 : 170 kV pilot installation with a ketone based insulation gas with first experience from operation in the grid
  • B3-106 : Application of a fluoronitrile gas in GIS and GIL as an environmental friendly alternative to SF6
  • B3-107 : Dielectric testing of GIS RC-dividers for HVDC GIS/GIL substations with increased dielectric requirements
  • B3-108 : Advanced insulation and switching concepts for next generation High Voltage Substations
  • B3-109 : Basic features of the new 145 kV metal-enclosed, SF6 gas-insulated switchgear
  • B3-110 : 2nd generation DC grid access for offshore wind farms: "HVDC in an AC fashion"
  • B3-111 : Customer process for technical qualification of NCIT-products for high-voltage GIS applications
  • B3-112 : ABB PASS M0S 420kV for transmission substation
  • B3-114 : An Autonomous Intelligent Robot for Electronic Equipment Inspection Used in Substation
  • B3-115 : High Frequency Current in the Power System and Its Influence on Transfer Accuracy of Electronic Current Transformer


PS2 : Developments and new thinking in substation design

  • B3-201 : Applying mixed technology switchgear (MTS) for adaptation of substations to meet new Brazilian power system requirements of availability
  • B3-202 : Brown Field Implementation of an IEC 61850 Based Integrated Protection and Automation System
  • B3-203 : Integrating In-house IEC61850 Technology into Existing Substation:A Case of EGAT Substation Control System
  • B3-204 : Countermeasures in a substations for large renewable energy adoption
  • B3-205 : Integrating IEC61850 into Existing Substations in MEA's Distribution System
  • B3-206 : Retrofitting and Modernization of Conventional Substation to An IEC 61850 Based Automated Substation – A Case Study of 400KV Amreli Substation
  • B3-207 : 50kV switchgear lost? Up & running in 30 hours solution!
  • B3-208 : Bus-Node - A Novel Substation Concept
  • B3-209 : Implementation of Building Information Modelling (BIM) process in substation design software to increase design quality
  • B3-210 : Mitigation of the Impact of Increasing Short Circuit Levels on Aging Transmission Substation Structures in Ireland
  • B3-211 : Integration of an IEC 61850 process bus in an existing substation
  • B3-213 : Development of common technical requirements for monitoring and diagnostic systems to improve availability of substations
  • B3-214 : Completing the IEC 61850 substation – the need for metering


PS3 : Evolution in Substation Management

  • B3-301 : RF Sensors Development and Condition Metric Development for Contaminated Substation Insulation
  • B3-302 : Current situation and Recent Challenges in Asset Management of Aging T&D Substation Facilities in Japan
  • B3-303 : Development of a Substation Fire Management Strategy and the implementation of a Hypoxic Fire Prevention System
  • B3-304 : Operational Experience In 1200kV (UHVAC) National Test Station, India
  • B3-305 : Partial Discharge Diagnosis Method using Non-phase Synchronized UHF PD Pattern based on On-site Measurement Database for Substation
  • B3-307 : Evaluation of the High Voltage Gas Insulated Substations (GIS) Based on Flashovers in the 220 kV Switchgears
  • B3-308 : Removing risk of eventual discharges between GIS grounding parts and cable sheath connected to the substation earth through a separate grounding lead
  • B3-309 : Impact of Renewable Grid Code compliance on Substation design
  • B3-310 : Enablers for Cost Saving in Air Insulated Substation Asset Management
  • B3-311 : Life extension program for GIS Circuit breaker retrofitting Le Havre Project
  • B3-312 : Using indicators to screen and monitor substation vulnerability affecting security of supply




PS1 : HVDC systems and their applications

  • B4-101 : A second and longer ± 800 kV DC bipole completes Belo Monte's integration
  • B4-102 : Semi-fullbridge Modular Multilevel Converter: An Inherent DC Fault Current Limiting Topology
  • B4-103 : Smooth coordination and management of impact of EstLink 2 transmission testing on electricity markets, power system operations and system technical performance
  • B4-104 : Celilo HVdc Terminal Upgrade Project – Pacific NW-SW HVdc Intertie System
  • B4-105 : Protective Firing in LCC HVDC: Purposes and Present principles. Settings and behavior
  • B4-107 : 50 years of Operating Experience of Sakuma Frequency Converter Station - Changing Roles in the Japanese Power System's Transition
  • B4-108 : Zambezi (previously Caprivi) Link HVDC Interconnector: Review of Operational Performance in the First Five Years
  • B4-109 : Commissioning Experience and Challenges of World's First 800 kV, 6000 MW NER – Agra Multi terminal HVDC System
  • B4-110 : AC-DC Interaction Study For Upcoming ± 800 kV, 3000 MW Champa Kurukshetra HVDC Link
  • B4-111 : Converter Transformer Inrush Control Using Hybrid Pre-insertion Resistors and Pointon- Wave Switching in the New Zealand HVDC System
  • B4-112 : Using Classic LCC HVdc to Transmit Renewable Energy from Weak AC Systems
  • B4-113 : HVDC Overhead Line Design Considering LCC vs. VSC Technology
  • B4-114 : Nelson River Pole 1 Thyristor Leakage Assessment & Online Monitoring
  • B4-115 : Enabling DC Fault Blocking Capability of Hybrid Modular Multilevel Converter HVDC using Asymmetrical Full-bridge Submodule
  • B4-116 : Test Circuit for Voltage Sourced Converter Valve in MMC-Based HVDC
  • B4-117 : Operational experience of new Spain-France HVDC interconnection
  • B4-118 : A closer look at protection concepts for DC systems
  • B4-119 : Improving the DC fault response of H-bridge MMC-based HVDC Networks
  • B4-120 : Automated Operation of Parallel VSC HVDC Links Embedded in an AC Power System
  • B4-121 : Diode-Rectifier HVDC link to onshore power systems: Dynamic performance of wind turbine generators and Reliability of liquid immersed HVDC Diode Rectifier Units
  • B4-122 : EMTP simulation verification of full bridge MMC HVDC operational advantages
  • B4-123 : Feedback on IFA 2000 France-England Refurbishment Project
  • B4-124 : Feedback on INELFE France Spain HVDC Project
  • B4-125 : Commutation failures mitigation in multi-infeed network with high renewable penetration: TERNA's experience
  • B4-126 : Communication-free control solution for the provision of frequency regulation services in HVDC grids: Numerical simulation and experimental validation in a reduced scale platforms
  • B4-127 : Study of Backbone Structure Change from Synchronous to Asynchronous in China Southern Power Grid
  • B4-128 : Interaction btween parallel HVDC an AC overhead lines
  • B4-129 : Experience from a bipolar HVDC system with a Voltage Source Converter and a Line Commutating Converter
  • B4-130 : Saudi Arabia Central-West HVDC Project: 3500 MW ±600 kV LCC 800 km High Performance embedded link crossing a desert area
  • B4-132 : Design consideration associated with DolWin3 and evolution of GE's Grid Solutions Business VSC Solution


PS2 : FACTS and other Power Electronic (PE) systems for transmission

  • B4-201 : Brazilian Experience Regarding Interactions between Series Capacitors and SVCs - Main challenges of the Tucurui-Macapa-Manaus Interconnection Project
  • B4-202 : Blocking reactor as part of SVC system - a novel concept for harmonics reduction and lowered operational losses
  • B4-203 : Comparison of Switching Schemes for STATCOMs using Modular Multi-Level Converters
  • B4-204 : Acoustic aspects for Air Core Dry Type Reactors - Specification, Design, Testing, Field Measurements
  • B4-205 : Essex STATCOM Life Assessment and Extension
  • B4-206 : Planning and commissioning of 130MVA GCT-STATCOM for transient stability improvement
  • B4-207 : IGBT Explosion Test for STATCOM Sub-module
  • B4-208 : Harmonic Performance Requirements and Mitigation for back-to-back HVDC in Turkish Transmission System
  • B4-209 : Magnetically controlled shunt reactor use in 110-500 kV power grids
  • B4-210 : Electrical Test of STATCOM Valves


PS3 : DC and other Power Electronic (PE) systems for distribution

  • B4-301 : Studies for Characterisation of Electrical Properties of DC Collection System in Offshore Wind Farms
  • B4-302 : Evaluation of the potential market for MVDC technology in Scotland
  • B4-303 : Integrating Smart Solid State Transformers Into Distribution Substations




PS1 : Protection Automation and Control System (PACS) Optimization and Life Time Asset Management

  • B5-101 : Recording and Documentation Criteria Proposed for the Complete Life Cycle of Digital Substation Automation Systems in Brazil - Findings and Trends
  • B5-102 : Comparison of Risk Assessment Approaches in Wide Area Protection Coordination
  • B5-103 : Innovative Wide-area and Local Voltage Control of Dynamic Shunt Compensation Devices to Prevent Voltage Collapse
  • B5-104 : Concept and Method of Replacement of Protection Relay and Control Equipment
  • B5-105 : Evaluation of Compensating Saturation Algorithms for Protective Current Transformers
  • B5-106 : Towards the plug&play challenge, pursuing the goal of streamline Distribution Grid Management and Maintenance
  • B5-107 : Functional Integration and IEC 61850 to optimise substation automation system design
  • B5-108 : Automatic configuration management for PACS
  • B5-109 : Optimization techniques reducing periodic maintenance and retrofit outage times with digital substation technology
  • B5-110 : The role of protection performance audits in the lifetime management of protection systems
  • B5-111 : System Redundancy in Power Substation Retrofits
  • B5-112 : Lifecycle management of existing PACS including maintenance and design at Rte
  • B5-113 : Automatic system for gathering data from IEDs - implementation specifics in Ukrainian power engineering
  • B5-114 : Improving the Fault Location for Romanian Power Transmission Lines using the Existing Measurements
  • B5-115 : Towards optimized digital substation automation systems
  • B5-116 : Protection, Automation and Control (PAC) LifeTime Management for Transmission and Distribution utilities: Commonalities and Contrasts
  • B5-117 : The Identification of Transmission Line Overload and Faults Based on Voltage Plane
  • B5-118 : Reliability Improvements on IEC 61850 Process Bus Application
  • B5-120 : Quantitative Reliability Assessment of Alternative Busbar Protection Schemes
  • B5-121 : Using of Optimization techniques for development of functionally integrated systems of relay protection and automation
  • B5-122 : PMU Based Real Time Vulnerability Assessment of Zone 3 Distance Relay to Prevent Cascading Outages


PS2 : Coordination of Generator and power system Protection

  • B5-201 : A Universal Relay Protection Coordination Model for Synchronous Machine Based on Transient Stability
  • B5-202 : Coordination of Power Plant Backup Protection and Transmission System Protection in Thailand
  • B5-203 : Coordination of Generator and Power System Protection in Korea
  • B5-204 : System Protection against Voltage Instability and Impact of Generator Protection
  • B5-205 : Operating experience with the coordinated requirements for power plant and power system protection
  • B5-206 : Probabilistic Analysis of Fault currents in Unbalanced Distribution Systems in the Presence of Stochastically Dependent Renewable Energy Re-sources.
  • B5-207 : Protection and Operation Requirements to Enhance Grid Stability with Large Scale Wind Integration in Egypt
  • B5-208 : Performance of generator protection during power system failures – selected protection functions and new experiences with unsymmetrical faults
  • B5-209 : The Performance Analysis of Protection Schemes in Transmission System with Series Compensated Transmission Lines using a Real Time Digital Simulator (RTDS)
  • B5-210 : Offshore context and protection issues
  • B5-211 : Coordinating Generating Units and Power System Protections
  • B5-212 : HV Open Phase Detection Method Based on Symmetrical Components
  • B5-213 : Requirements for relay protection and automation applications of electric power stations, providing stability of their operation in electric power system
  • B5-214 : High-speed Generator-transformer Unit Backup Protection Scheme




PS1 : State of the art approaches and standardization in asset management decision making

  • C1-101 : Transitioning of Distribution Asset Management to a Prescriptive Approach
  • C1-102 : Analysis of SCADA data for early fault detection in Wind turbines
  • C1-103 : Development and application of an asset criticality framework to prioritise asset expenditure
  • C1-104 : Changing interaction between asset renewal and planning in Australia and New Zealand
  • C1-105 : Transmission Asset Management Through in-House Developed Software for Transmission System of Gujarat State
  • C1-106 : Hazard Rate Model for Risk-based Asset Investment Decision Making


PS2 : Interfac e and allocation issues in planning T&D networks with multi-party projects

  • C1-202 : Assessment of Island Interconnection Projects via HVDC Links of Partial Capacity: The Case of Crete
  • C1-203 : Transmission Network Planning and Delivery: comparing the German and Chilean Experiences
  • C1-204 : Managing Regional Security of Supply: A Case Study from Scotland
  • C1-205 : Djibouti Transmission Master Plan at 2033 horizon
  • C1-206 : Research on Power Grid Planning Data Model and Data Stream of State Grid Corporation
  • C1-207 : Challenges in Realising the Potential of the GCC Interconnector


PS3 : New system solutions and planning techniques for flexible and robust system plans

  • C1-301 : Energizing Green Cities in Southeast Asia: Application of Sustainable Urban Energy and Emissions Planning in Vietnam
  • C1-302 : Integration of Series FACTS into Interconnect-scale Production Cost and Long-term Planning Tools
  • C1-303 : Innovative approach to obtaining authorisation for new power corridors in South Africa
  • C1-304 : Change in selection philosophy of shunt line reactor allows Eskom to realize perpetual economic benefits
  • C1-305 : Overcoming barriers to the use of alternative and innovative solutions such as standalone power systems as an alternative to replacement of end-of-life network assets
  • C1-306 : Transmission System Planning under uncertainties including renewable penetration regime in Indian Context
  • C1-307 : Probabilistic Power Flow as an element of planning methodology
  • C1-308 : Assessment of the Impact on Hybrid AC/DC Power System Following a Change of the Bulk Power System
  • C1-309 : Offshore wind farm stochastic economic evaluation
  • C1-310 : Optimization of RES Generation in the European System
  • C1-311 : Technical and Economical Evaluation of the Use of Energy Storage to Provide Frequency Regulation Services in the Chilean Interconnected Systems
  • C1-312 : Complex Modernization of Russian Distribution Network of Bashkirenergo based on advanced Smart Grid Technologies
  • C1-314 : Côte d'Ivoire Generation and Transmission Master Plan at 2030 horizon
  • C1-315 : e-Highway2050: a research project analysing very long term investment needs for the pan-European transmission system
  • C1-316 : French Zonal Model for Development Studies
  • C1-317 : An innovative cost-benefit analysis to assess transmission projects: the Italian case
  • C1-318 : Application of innovative grid-impacting technologies in pan-European and regional case studies towards the EU Energy Union: the GridTech analyses
  • C1-319 : A practical implementation of representative planning case selection for grid studies, as used in TYNDP studies for ENTSO-E
  • C1-320 : Research on the Efficient and Secure Transmission of Wind, PV and Thermal Power from Large-scale Energy Resource Bases through UHVDC Projects
  • C1-321 : Comparison between Deterministic and Probabilistic Methods for Evaluating Grid-Accommodative Wind Power Capacity
  • C1-322 : Systematic Approach for Dynamic Equivalents Development of Large-Scale Power System Using PSS/E
  • C1-323 : Planning and Design Considerations Associated with the Integration of the UAE's First Nuclear Power Plant
  • C1-324 : Improvement of mode controllability and short-circuit currents limitation in metropolises power grid by means of electromechanical AC links as an alternative to DC links




PS1 : Grid operation solutions to changes in generation mix including distributed and renewable generating resources

  • C2-101 : Using a Static and Dynamic Security Assessment Tool to Evaluate the Effects of Increasing Wind Power Penetration in Future Operating Conditions of the Brazilian Interconnected Power System
  • C2-102 : Improvement of Technical Requirements for Connecting Wind Plants in the Brazilian Interconnected Power System
  • C2-103 : High Fidelity Modeling Approach to Analysing Combined-Cycle Power Plant Response to Proposed ROCOF Requirements in Ireland
  • C2-104 : Tuning primary frequency controllers using robust control theory in a power system dominated by hydropower
  • C2-105 : Full Scale Frequency Response Tests in the Nordic Synchronized Area
  • C2-106 : Integration of PV Contribution into the Load Forecast and Dispatch
  • C2-107 : Selective Generation Shift Key determination - an enhanced method for the flow-based market coupling capacity calculation
  • C2-108 : Secondary Frequency Control and Balancing Operation Using Coordination Control of Conventional Sources and Battery Energy Storage System with Large-scale Renewable Energy Integratio
  • C2-109 : Storage application for frequency control of hourly cross-border program changes
  • C2-110 : Innovative tools for the future coordinated and stable operation of the pan-European electricity transmission system
  • C2-111 : Increased cooperation between TSO and DSOs as precondition for further developments in ancillary services due to increased distributed (renewable) generation
  • C2-112 : Primary control reserves provision with battery energy storage systems in the largest European ancillary services cooperation
  • C2-113 : Real time synchronous generator dynamic reactive reserve monitoring by coordinated reactive power voltage controller
  • C2-114 : Anticipating Power System Needs in Response to the Global Energy Transition
  • C2-115 : Emulated Inertial Response from Wind Power: Ancillary Service Design and System Scheduling Considerations
  • C2-116 : Operational Security Challenges and Tools for a Synchronous Power System with High Penetration of Non-conventional Sources
  • C2-117 : Smart dispatch of variable-speed Pump Storage Plants to facilitate the insertion of intermittent generation
  • C2-118 : Innovative solutions for real-time Dynamic Security Assessment and automatic system devoted to special protection schemes of Italian Defense plan
  • C2-119 : Power Systems Oscillations Damping with Regard the Finite Speed of Propagation the Electromechanical Waves
  • C2-120 : Integration of 2 days-ahead capacity forecast for managing Belgian energy imports
  • C2-121 : Monitoring, operation and control solutions in the process of renewable energy source integration Transelectrica's experience
  • C2-122 : Probabilistic dimensioning of tertiary control reserve driven by the intermittency of renewable generation in Portugal
  • C2-123 : Stability Control Strategy and Operation of Large-Scale UHVAC/DC Hybrid Power System
  • C2-124 : New Ancillary Service to Mitigate Determistic Frequency Deviations
  • C2-125 : Automatic device of monitoring of stability margins


PS2 : Managing system disturbances and system restoration

  • C2-201 : Ensuring the black start capability of the South African Power system
  • C2-202 : Geomagnetic Disturbances Monitoring, Modelling and Mitigation
  • C2-204 : Wide-area control of SVCs in Australian power system
  • C2-206 : Control of wind farm and VSC-HVDC to enhance frequency reserve
  • C2-207 : Methodology for next generation system operation between DSO and DSO
  • C2-208 : Advances in Wide Area Monitoring and Control to address Emerging Requirements related to Inertia, Stability and Power Transfer in the GB Power System
  • C2-209 : Disturbance Management in the Turkish Power System interconnected with the ENTSOE System. Defence Strategies and Operation Experience
  • C2-210 : Norwegian disturbance management system and database
  • C2-211 : Power system operation efficiency increasing considering transfer capacity parameters affection
  • C2-212 : Operator Training for Restoration of Power Systems with High Shares of Volatile Generation
  • C2-213 : An Assessment of a Cost-effective Demand Response Scenario A case study for Jordan




PS1 : Environmental liabilities of transmission and distribution assets

  • C3-101 : Analysis of the Impact of Geomagnetic Disturbances on the Austrian Transmission Grid
  • C3-102 : Electrocution risks to endangered birds on MV overhead lines – South African experiences
  • C3-103 : The authorization procedure for Energy Storage Systems Projects installed on the Italian Transmission Grid
  • C3-104 : Liability for contaminated sites initiated by the unbundling of the transmission grid in Belgium


PS2 : Overhead lines and underground cables: acceptability issues

  • C3-201 : Evaluation method for values derived from substation instalment
  • C3-202 : Ausgrid's North Shore 132kV Cables Project - Learnings on Route Selection, EMF Mitigation and Stakeholder Engagement
  • C3-203 : HV Underground Cables Magnetic Field Mitigation Measures
  • C3-204 : 3D multi-viewpoints environment to analyze the visual impact of overhead lines
  • C3-205 : Analysis of Induced Electromotive Force in Phase Conductors of 35 kV Line Caused by Phase-to-Ground Fault in 400 kV Overhead Power Line
  • C3-207 : On the use of the HMCPL shielding system in renewing the underground HV power lines in big cities
  • C3-209 : Life cycle assessment of the UGC transmission system in Iceland
  • C3-210 : Environmental Impact and Prevention analysis for urban Substations


PS3 : Climate Change: Implications for Electric Power Systems

  • C3-301 : Hydropower plants and the Climate Change: Impacts and Actions
  • C3-302 : Enhancing resilience of the North Indian Power System against pollution and foggy weather - An Experience
  • C3-303 : An approach to dealing with visual impact of existing high voltage transmission lines
  • C3-304 : Reduction of greenhouse gases in GIS pilot project application in UK
  • C3-305 : Climate Change Impact on Electrical Power System, Case study from Jordanian Electrical System




PS1 : Impact of inverter based generation and Energy Storage

  • C4-101 : Harmonic Distortion Assessment Related to the Connection of Wind Parks to the Brazilian Transmission Grid
  • C4-102 : Transient Stability Impacts of High Levels of RES on the Western US Grid
  • C4-103 : Utility Connected Smart Inverters – Lessons Learned from Demonstration of Open Standards and Protocols
  • C4-104 : Development of improved aggregated load models for power system network planning in the Nordic power system
  • C4-107 : Voltage Swell Mitigation in EHV Real Network Using Flexible AC Transmission Systems Based on Evolutionary Computing Method
  • C4-108 : Power Quality Monitoring and Assessment in the Spanish Transmission System
  • C4-109 : STORE: A Comprehensive Research and Demostration Project on the Application of Energy Storage Systems in Island Power Systems
  • C4-110 : Power Intensive Energy Storage and Multilevel STATCOM for frequency and voltage grid support
  • C4-111 : Challenges in harmonic assessments of non-linear load connections
  • C4-112 : Amplification of Harmonic Background Distortion in Wind Power Plants with Long High Voltage Connections
  • C4-113 : Power Quality and EMC Issues associated with future electricity networks – status report on behalf of CIGRE/CIRED JWG C4.24
  • C4-114 : Investigation of Harmonics Trends and Characteristics on the Irish Transmission System by analysing Historical PQ Measurements and SCADA Records
  • C4-116 : Electrochemical Energy Storage Systems and ancillary services: the Italian TSO's experience
  • C4-117 : Impact of Photovoltaic Power Systems Control on Romanian Power Quality as Measured in the Connection Common Points
  • C4-118 : Assessing Inverter Based Generation Exposure to Voltage Sags
  • C4-119 : Impact of Connecting Renewable Power Plants on the Dynamic Voltage Response, Voltage Stability and Low Voltage Ride Through (LVRT) Capability


PS2 : Challenges with modeling and evaluation of lightning performance and insulation coordination in the power system of the future

  • C4-201 : Application of the Leader Progression Model to evaluate the lightning performance of AC and DC EHV transmission lines
  • C4-202 : Overview of statistical data on lightning outages of transmission lines in Japan
  • C4-203 : Economic Assessment of Lightning Performance Improvement of 69 kV Overhead Subtransmission Line on Monopole and Concrete Pole in MEA's Power Distribution System
  • C4-205 : Assessment of Lightning Shielding Performance of a 400 kV Double-Circuit Fully Composite Pylon
  • C4-207 : Analysis of opportunities to improve the HVDC SwePol Link operation due to commutation failures
  • C4-208 : Investigating the Methodology and Implications of Implementing Long HVAC Cables in the Ireland and Northern Ireland Power System
  • C4-209 : Isolated systems interconnected via HV submarine XLPE cables
  • C4-210 : Switching transients on very long HV ac cable lines: simulations and measurements on the 230 kV malta-Sicily Interconnector
  • C4-213 : Measurement Techniques on Transient Process of Lightning Striking Overhead Transmission Lines


PS3 : Bridging the gap between EMT , FEM and positive sequence grid simulation

  • C4-301 : Simulating Single-Pole Opening Using a Detailed Protection Model and a Transient Stability Program
  • C4-302 : Development of surge simulation techniques based on the finite difference time domain method and its application to surge analysis
  • C4-303 : Defining - and Computing the Margin in Critical Clearing Time: Eskom experience
  • C4-304 : ''Shunt Compensation, Reliability Analysis and Condition Monitoring System measurements and simulations for an EHV mixed Overhead line - Cable connection
  • C4-305 : HVDC system modeling coherence between EMT and phasor domain tools




PS1 : Interactions between wholesale and retail markets; the future of regulation

  • C5-101 : Aligning Regulatory Incentives and Price Signals in the Brazilian Wholesale and Retail Electricity Markets
  • C5-102 : Market design of one hour ahead and real time market and implementation of crossregional network operation in Japan
  • C5-104 : A methodology for the analysis of market design at the horizon 2030
  • C5-105 : New approach to congestion management for decentralized market coupling using net export curves


PS2 : Market models and regulatory structures in an evolving industry situation

  • C5-201 : Practices for Risk Assessment and Control in the Brazilian Electricity Market: state of the art
  • C5-202 : Market coupling, facing a glorious past?
  • C5-203 : The Importance of a Performance-Based Capacity Market to Ensure Reliability as the Grid Adapts to a Renewable Energy Future
  • C5-204 : HVDC Transmission Scheme for Sustainable Energy Supply
  • C5-205 : Impacts of asset investment of renewable energy on market design and operation
  • C5-206 : Renewable Energy Policy and Barriers under Fluctuation of Energy Price and Economic Growth in Thailand
  • C5-207 : Introduction of Sub-Hourly Market in Power Exchanges and Facilitating Large Scale Renewable Energy Integration in India
  • C5-210 : Mexico ´s Wholesale New Power Market
  • C5-211 : Restructuring System Services for the Highest Levels of Wind Integration
  • C5-212 : Capacity Markets and the EU Target Model – a Great Britain Case Study
  • C5-213 : Capacity Mechanisms: Results from a World Wide Survey
  • C5-214 : Flow-based market coupling in the Central Western European region: Welcome to the market coupling 2.0
  • C5-215 : Techno-economic analysis and simulations of the transmission and distributions systems interactions in different regulatory frameworks
  • C5-216 : Implementation of a Strategic Reserve in Belgium: Product Design and Market Results
  • C5-217 : Study on Key Issues of Direct Trading between Power Users and Plants
  • C5-218 : Capacity market. Change of the model shifting from deficit to excess
  • C5-219 : Evaluating Regulatory Framework in Iran's Electricity Sector: A Benchmarking Analysis


PS3 : Distributed resource and demand response integration from the perspective of electricity market structures

  • C5-302 : Experiences and Lessons Learned based on Distributed Generator of EGCO in Thailand Power Grid
  • C5-303 : Market Access for Renewables in the German Power Market and Market Design Challenges
  • C5-304 : Comparison of market designs enabling DSR participation in the energy market
  • C5-305 : The impact of active demand on the electrical system and its actors estimated wthin the ADVANCED project
  • C5-306 : Project SMART – lessons learned from the emergency DSR programmes involving residential consumers and the aggregator
  • C5-307 : DSO-TSO Interactions in Flexibility Contracting
  • C5-308 : The importance of market regulation in exploiting demand response on balancing market: Slovenian and Austrian case




PS1 : Integrated planning and operation for up grading distribution networks

  • C6-102 : Messaging for Enterprise Distributed Energy Resources
  • C6-103 : Learning from a 3.275 MW Utility Scale PV Plant Project
  • C6-104 : Dynamic distribution system planning considering distributed generation and uncertainties
  • C6-105 : A Probabilistic Monte-Carlo Simulation to Assess Distribution Network Reliability
  • C6-106 : Advanced Self-Healing for Wide Area Power Outage and Network Reconfiguration for Feeder Uploading
  • C6-107 : Impact of Distributed Energy Resources and Normally Open Switches on the Operational Performance of Low Voltage Distribution Networks
  • C6-108 : An Adaptive Protection Infrastructure for Modern Distribution Grids with Distributed Generation
  • C6-109 : Protection coordination for distribution systems containing distributed generating units
  • C6-110 : State estimation in MV distribution networks: experience in the Spanish smart grid project PRICE-GDI
  • C6-111 : Linear State Estimation in Low Voltage Grids Based on Smart Meter Data
  • C6-112 : Intelligent control of on-load tap changer based on voltage stability margin estimation using local measurements
  • C6-113 : South East Europe Distribution System Operators Benchmarking Study
  • C6-114 : Key findings of a study into the development of future GB systems integrating low carbon technologies and smart solutions
  • C6-115 : Impact of distributed generation on load shedding scheme in France: current status and perspectives
  • C6-116 : Technical-economic optimum development plan of the Distribution Network of Abidjan
  • C6-117 : Prosumers' Battery Electrical Storage Systems: new ancillary services, impact on network planning and operation
  • C6-118 : Real field testing results of the innovative Medium Voltage control system developed in the Italian Demonstrator of GRID4EU
  • C6-119 : Linear Optimization for Active Distribution Systems Operation Considering Demand Response Mismatch


PS2 : Energy infrastructure for urban networks

  • C6-201 : Local Adaptive Control of Solar Photovoltaics and Electric Water Heaters for Real-time Grid Support
  • C6-202 : Towards Holistic Power Distribution System Validation and Testing – An Overview and Discussion of Different Possibilities
  • C6-203 : Optimized and Enhanced Grid Architecture for Electric Vehicles in Europe
  • C6-204 : Leveraging Smart Grids Assets for Building Smart Cities at Marginal Cost
  • C6-205 : Advancing the method of estimating the distribution system condition by utilizing smart meters
  • C6-206 : Beyond Smart Meters: Management of the LV network
  • C6-208 : Planning studies for active distribution grids in presence of EVs charging stations: simulation on areal test network
  • C6-209 : The Integrated Model for Marketing and Distribution Information - Integration Architecture, Implementation and Validation
  • C6-210 : Demonstrations of Communication Standards for Automated Demand Response and Smart Grid


PS3 : Microgrids and offgrid hybrid systems

  • C6-301 : NY Prize Community Grid Competition
  • C6-302 : Fast Demand Response as an Enabling Technology for High Renewable Energy Penetration in Isolated Power Systems
  • C6-303 : No Load Diesel Application to Maximise Renewable Energy Penetration in Offgrid Hybrid Systems
  • C6-304 : Business Cases for Isolated and Grid-connected Microgrids – Methodology and Applications
  • C6-305 : Decision and Management to Interconnect Distributed Energy Resources into Distribution Networks
  • C6-306 : Smart Region – Automation of Distribution System
  • C6-307 : Battery Energy Storage Control Strategies for Deterministic and Stochastic Power Profiles
  • C6-308 : Smart grids for rural conditions and e-mobility - Applying power routers, batteries andvirtual power plants 
  • C6-309 : Probabilistic Planning of Multi-Microgrids with Optimal Hybrid Multi-Generation sets
  • C6-310 : The Hybrid Energy Storage System based on lithium-ion batteries and supercapacitors




PS1 : Compact Insulation Systems (AC and DC)

  • D1-101 : Solid-gas insulation in HVDC gas-insulated system: Measurement, modeling and experimental validation for reliable operation
  • D1-102 : Interest of simulations to assess tests to be performed on DC GIS
  • D1-103 : Various Characteristics of GIS Insulation Systems and Test Method of Insulating Spacers for Residual DC Voltage
  • D1-104 : Evaluation of small scale testing for high field conductivity of HVDC cable materials
  • D1-106 : Study of dielectric properties of XLPE for HVDC cables during long-term ageing
  • D1-107 : ZnO stress grading tape for stator windings for electrical machines located at higher altitudes
  • D1-109 : Tracking and Erosion Tests for SR Composite Insulators under DC Voltage
  • D1-110 : Long-term performance of composite station insulators with larger diameters: laboratory tracking and erosion test vs. service experience
  • D1-111 : The Effect of Bird Streamers on the Insulation Strength of HVDC Lines
  • D1-112 : Performance of polymeric insulators in hybrid AC/DC overhead lines under polluted conditions
  • D1-113 : GCCIA POLLUTION TEST STATION: An Optimizing Tool for Pollution Site Severity & Selection of Optimum Insulators Profile In Eastern KSA


PS2 : New materials

  • D1-201 : Electrical and thermal behaviour of synthetic transformer liquids
  • D1-202 : Preliminary study for use of vegetable esters in big power transformers
  • D1-203 : Molecular Simulation and Experiment of Transformer Cellulose Insulation Paper Modified by Nano Al2O3
  • D1-205 : Validation method and comparison of SF6 alternative gases
  • D1-206 : Thermoplastics for LV Switchgear Application
  • D1-207 : Preparation of Thermal Conducive Insulating Composite Material Using Electrostatic Adsorption Method
  • D1-208 : Comparative Investigation on Ester Insulating Liquids for High Voltage Applications


PS3 : Non-standardised stresses and emerging test techniques

  • D1-301 : Developments for Frequency Response Analysis Automation
  • D1-302 : Diagnostic control of oil-paper insulation based on method of "direct" measurement of paper moisture content
  • D1-303 : Development of a new spectrophotometric method for analysis of 2-furfuraldehyde in transformer oil as an indicator of paper degradation
  • D1-304 : Dissolved Gas Analysis Applied to on Load Tap-Changers
  • D1-305 : A study of liquid-immersed transformer reference insulation systems used to determine thermal class
  • D1-306 : A development of DC PD pattern recognition method using Modified CAPD together with PD founding for Gas insulated apparatus under DC voltage
  • D1-307 : Signal processing and study of the ripple influence in PD patterns for measurements under HVDC stress
  • D1-308 : A Review of Dielectric Strength with Distorted Lightning Impulses
  • D1-309 : Insulation Evaluation of High-voltage Insulation Systems for Actual Overvoltage Waveforms and Practical Field Conditions
  • D1-310 : Correcting the Errors of Large Impulse Ultra High Voltage Dividers with the Deconvolution Method
  • D1-311 : Investigation of mechanical strength for station post composite insulators subjected to variable loads




PS1 : New applications to control power systems

  • D2-101 : Smart: Intelligent and integrated platform for power operation centers
  • D2-102 : Implementation of PMU-Based Linear State Estimation into Energy Management Systems
  • D2-103 : Leveraging Big Data and Modern Communication Protocols to Facilitate New Applications in Power Transmission and Distribution
  • D2-104 : Implementation of Information and Telecommunication Systems with the aim of Realization of Smart Grid in Japan
  • D2-105 : Communications Infrastructure for Future Centralized Substation Protection and Control Systems
  • D2-106 : Implementation of Online Power System Network Analysis for the EMS in Korean Electric Power Control Center
  • D2-107 : Results of applying a semantic interoperability strategy in Smart Grid applications for DSO in Mexico
  • D2-108 : Classification of customers based on temporal load profile patterns
  • D2-109 : COCO: Operational control of construction
  • D2-110 : Adding New Functions to the Energy Control System for Operating More Than a Decade in Taiwan
  • D2-111 : Portable WAMS – a Paradigm Shift
  • D2-112 : Experiences from Intelligent Alarm Processing and Decision Support Tools in Smart Grid Transmission Control Centers
  • D2-113 : Distributed control architecture for effective Distributed Energy Resources Management
  • D2-115 : Optimizing the Network and the Asset Lifecycle and Reduce Operational and Capital Costs through Predictive Analytics and Asset Health Management
  • D2-116 : Study and Practice of General State Estimation and Load Flow Hybrid Method for Modern Power Systems Control Centers


PS2 : EPU response to evolving cyber security landscape

  • D2-201 : Network Architecture and Cyber Security – Two Faces of the Same Coin
  • D2-202 : Cyber Security Architecture for Operational Technologies (ICS/SCADA)
  • D2-203 : Application and Management of Cybersecurity Measures for Protection and Control
  • D2-204 : Application of Monitoring Standards for enhancing Smart Grids Security
  • D2-205 : Fuzzy Rule Based Expert System for SCADA Cyber Security


PS3 : Mobile operational applications, systems and infrastructure

  • D2-301 : Wireless and Mobile Systems for Electric Power System Operation in Japan
  • D2-302 : Ensuring Uptime of WAMS Network with the Help of Common IT Tools – Case Studies
  • D2-303 : Communication Networks for Indian Smart Grids
  • D2-304 : Usefulness of AMI data communication systems to the development of Polish DSO smart MV and LV grids with regard to SCADA control systems
  • D2-305 : MAGIC – A Microgrid AGent Intelligent Control Device
  • D2-306 : PLC MV telecommunications: An evolution path for sustainable private telecom networks enabling smart grid applications
  • D2-307 : IT and OT integration to improve outage management
  • D2-308 : Study on Evolution of Communication Infrastructure for Smart Grid Operation and Management
  • D2-310 : Communication network toward the realization of a new power distribution automatic control system

File Size: 796,6 KB

Year: 2016

40€ buy
Non member
80€ buy

Your AccountYour Account

Password forgotten


may download free of charge all publications including most recent ones

Non Members

may download free of charge publications over three years old and purchase all publications

For any questions in connection with the on-line library, contact:

Publications and Editions Manager