Your browser does not support iframes.
e-cigre.org
on-line library and bookstore
The Kimal Lo Aguirre HVDC
project: Chile's decarbonization
transmission line. Read now >>
File Size: 1 MB
Pages NB: 8
Study Committee: 31 (now C1) ?
Year: 1982
Electra
ELECTRA Digital June 2022
Ref.: ELT_322
2022
CIGRE SC. & ENG.
CSE 025
Ref.: CSE025
Webinars
Recommendations for mechanical testing of submarine cables for dynamic applications
Ref.: WBN039
Technical Brochures
Current Interruption in SF6-free Switchgear
Ref.: 871
Green Books
Power System Assets - Investment, Management, Methods and Practices
Ref.: GB 12
Service Continuity Guide for HV GIS above 52 kV
Ref.: 870
Mitigating the risk of fire starts and the consequences of fires near overhead lines for System Operations
Ref.: 868
Flexible AC Transmission Systems (FACTS) controllers' commissioning, compliance testing, and model validation tests
Ref.: 867
Design guideline for substations connecting battery energy storage solutions (BESS)
Ref.: 869
Enabling software defined networking for electric power utilities
Ref.: 866
Guide for Transformer Maintenance
Ref.: 445
2011
Sag-Tension calculation methods for overhead lines
Ref.: 324
2016
Life management techniques for power transformers
Ref.: 227
2003
Voltage Source Converter (VSC) HVDC for Power Transmission - Economic Aspects and Comparison with other AC and DC Technologies
Ref.: 492
2012
Update of service experience of HV underground and submarine cable systems
Ref.: 379
2009
Guide to procedures for estimating the lightning performance of transmission lines
Ref.: 063
1991
HVDC grid feasibility study
Ref.: 533
2013
Recommendations for testing of long AC submarine cables with extruded insulation for system voltage above 30 (36) to 500 (550) kV (This TB replaces electra article ELT_189_1)
Ref.: 490
Transformer reliability survey
Ref.: 642
2015